My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: <br />Project: Warner Avenue Improvements Project PCO#: 6119 <br />Project No.: 14.6802; 18-6424; 20-6618 Revision: 12/11/2023 <br />Owner: City of Santa Ana bate: 12/11 /23 <br />Description of Work: T&M for additional work to construct CB on Orange Avenue <br />Disposed Water, gas, nd sewer fine, removed trees, repair sewer line <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT' <br />EXTENDED <br />AMOUNTS <br />Regular <br />DT <br />Regular <br />OT <br />Trenton Hong (operator) <br />8 <br />$71.25 <br />$162.73 <br />$570.00 <br />Guillermo Saldana (Operator) <br />8 <br />$119.42 <br />$162.78 <br />$955.36 <br />Ramon Guillen (Foreman Masan) <br />5 <br />$99.94 <br />$135,07 <br />$499.70 <br />Salvador Saldana (Labor IV) <br />0 <br />$92.57 <br />$125.81 <br />$0,00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125.90 <br />$0.00 <br />Raman Guillen Jr. (Mason) <br />0 <br />$93.83 <br />$125.90 <br />$0.00 <br />Cruz Benavente Chan (App) <br />5 <br />$71.25 <br />$98.67 <br />$356.25 <br />Peter Arroyo {App} <br />$71.25 <br />$98.67 <br />$0.00 <br />Manuel <br />0 <br />$92.57 <br />$125.81 <br />$0.00 <br />Jorge Alejandres (Labor App IV) <br />0 <br />$71.25 <br />$98.67 <br />$0.00 <br />$0.00 <br />Explain Additional Benefit: <br />SUBTOTAL <br />$2,381.31 <br />MU 20% <br />TOTAL LABOR <br />_ $476.26 <br />�$2,857.57 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP, <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />0 <br />$256.50 <br />$0.00 <br />CAT 415F Skip Loader <br />0 <br />$47.87 <br />$0.00 <br />CAT 45OF Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$63.95 <br />$0.00 <br />CAT 950H Loader <br />5 <br />$136.17 <br />$680.85 <br />CAT 972H Loader <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />$40.25 <br />$0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />8 <br />$50.64 <br />$405.12 <br />Crew Truck 20000 LB <br />4 <br />$37A 9 <br />S148.76 <br />Water Truck 36000 LB <br />4 4 <br />CAT 315E <br />8 <br />$61.38 <br />$491.04 <br />Generator ❑ <br />" Explain Other Costs: <br />$19.84 <br />SUBTOTAL <br />MU 15% <br />TOTAL EQUIPMENT <br />$o.pp <br />$1,725.77 <br />$258.87 <br />$1,984.64 <br />MATERIAL <br />Description (Attach invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Traffic Control <br />h <br />0 <br />68.75 <br />$0.00 <br />30.00 <br />SUBTOTAL <br />MU 15% <br />TOTAL MATERIAL <br />$0.00 <br />$0.00 <br />$0,00 <br />$0.00 <br />OTHER WORK <br />Transport of the soil <br />UNITS <br />Load <br />QTY. <br />UNIT <br />PRICE <br />$305.00 <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />0.00 <br />* Explain Other Costs: SUBTOTAL <br />MU 15°/e <br />TOTAL OTHER Wdkkl:::::::: <br />$0.00 <br />$0.00 <br />$0.00 <br />If Above cord is Complete and Correct <br />Contra is Re reseniative <br />f <br />O ers Rq resentative <br />TOTAL LABOR <br />$2,857.57 <br />TOAL EQUIPMENT <br />$1,984-64 <br />TOTAL MATERIAL and Other <br />$0.00 <br />BOND 1 % <br />$48.42 <br />TOTAL THIS PROPOSAL 1 $4,890.63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.