122
<br />12. 17th Street and Grand Avenue
<br />Intersection Project
<br />Existing Conditions and Recommendations
<br />17th Street and Grand Avenue is a busy intersection in the upper
<br />east quarter of the City with commercial retail at all corners. Five
<br />vehicle lanes, not counting multiple turn lanes in each direction, are
<br />on each leg of the intersection. Very high traffic volumes see similarly
<br />high collision rates during the study period, with multiple severe
<br />injuries near this intersection where raised medians are not provided.
<br />Sidewalks, curb ramps, and bus stops are provided on both sides
<br />of the street. No bicycle facilities are provided. Figure 6-13 shows
<br />recommended improvements that could be extended farther along
<br />the route.
<br />See Appendix D for a detailed breakdown of all cost estimates.
<br />Project Location
<br />00.510.25Miles
<br />Serious Injuries and Fatalities between 2017-2021
<br />1
<br />Pedestrian
<br />0 1
<br />Bicycle Vehicle
<br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))****
<br />11,,338833,,004455$$ 11,,773311,,335522$$
<br />4400,,000000$$ 4488,,666666$$
<br />11,,442244,,000000$$ 11,,778811,,000000$$
<br />118800,,000000$$ 222200,,000000$$
<br />225500,,000000$$ 331100,,000000$$
<br />3300,,000000$$ 4400,,000000$$ CM228800,,000000$$ 335500,,000000$$
<br />774400,,000000$$ 992200,,000000$$
<br />22,,117700,,000000$$ 22,,771100,,000000$$
<br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were
<br />made.
<br />PPSS&&EE ((1177..55%%))
<br />RRIIGGHHTT OOFF WWAAYY ((22%%))
<br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%))
<br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT DESIGNTTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT
<br />SSaannttaa AAnnaa VViissiioonn ZZeerroo
<br />1177tthh SStt aanndd GGrraanndd AAvvee IInntteerrsseeccttiioonn
<br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt))
<br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE
<br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT
<br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT
<br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS
<br />PPAA//EEDD ((1122..55%%))
<br />Santa Ana Vision Zero Summary
<br />
<br />
<br />City Council 32 – 127 6/4/2024
|