My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 31 - Agreement with Yunex Traffic for Traffic Signal and Street Lighting Maintenance
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 31 - Agreement with Yunex Traffic for Traffic Signal and Street Lighting Maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:12:10 PM
Creation date
5/29/2024 6:09:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
31
Date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the Contractor's bid proposal. All materials and parts shall be new or have the <br />approval of the Traffic Engineer. <br />The City has the right to inspect the Contractor's records to verify any material <br />costs used in extraordinary maintenance <br />(ii) Direct Labor: The Contractor shall present with his monthly invoice a record of <br />hours spent in extraordinary maintenance of streetlights and appurtenances per <br />address. City shall pay the Contractor for such hours of extraordinary <br />maintenance performed at the job site address at the rates specified on the <br />Contractor's bid proposal. Crews shall be dispatched so as to maximize work <br />performed. Said hourly rates shall be the total cost to City. Rates shall include all <br />compensation for wages, profit, overhead, any fringe benefits such as employer <br />payments to, or on behalf of, work for health and welfare, insurance, worker's <br />compensation, pension, vacation, sick leave or any local, state, federal, or union <br />tax or assessment. <br />(iii) Equipment: City shall pay the Contractor for equipment used in extraordinary <br />maintenance on a job -trip basis rate as specified in the Contractor's bid proposal. <br />The Contractor's hourly equipment rates shall constitute the rates to be paid by the <br />City when the specified equipment is used for the extraordinary maintenance. As <br />used herein, job -trip shall mean the furnishing of the required equipment at the <br />site of extraordinary maintenance work for the duration of the work. No <br />additional compensation shall be paid for transporting equipment to or from the <br />job site. <br />• The Contractor's listing of per day equipment rates shall constitute total rates <br />to be paid by City when specified equipment is used. <br />• As used herein per day shall mean the furnishing at the site of extraordinary <br />maintenance work the equipment specified. The per -day rate shall be <br />independent of the length of time the equipment is in the City. <br />• No additional compensation shall be paid for transporting the equipment to or <br />from the job site <br />9. Meeting <br />The City may call for meetings to be held with the Contractor, including personnel <br />routinely assigned to work in Santa Ana, on an as needed basis without incurring <br />additional cost to the City <br />III. SUMMARY REPORTS <br />Contractor shall furnish the following reports and maintenance database: <br />A. Traffic Signal System Routine and Extraordinary Maintenance Monthly Report <br />City of Santa Ana RFP 24-046 <br />Page Al-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.