My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1924
Clerk
>
Minutes
>
CITY COUNCIL
>
1886-1951
>
1924
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:29:33 PM
Creation date
4/9/2003 4:24:48 PM
Metadata
Fields
Template:
Pre-Charter
Year
1924
Pre-Charter - Doc Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25O <br /> <br />In He <br /> <br />Deed <br /> <br />Greenleaf St. <br /> <br />In He <br /> <br />Bids <br /> <br />Roe Drive. <br /> <br />In He <br /> <br />Bids <br /> <br />W. 19th St. <br /> <br />On mot~cn of Trustee Neff, seconded by McPhee and <br /> <br />carried, it is the sense of the Board that deed <br /> <br />f~r 50 ft. street, being continueticn of Green]eof St. <br /> <br />north frtm Lonte Clara, will be accepted by the Bm rd <br /> <br />w}~eu presented. <br /> <br />This being the time and rlace fixed and set forth for <br /> <br />the opening of bids or proposals for the imFrovement o~ <br /> <br />Hoe Drive, as briefly described in Resolutlou of <br /> <br />Intention No. 1242, and the Board of Trustees being <br /> <br />duly convened in open session, proceeded to an¢ did <br />publicly open, examine ~nd declare all bids received. <br />Only one b~d was received, heirs that of 5. R. Word <br /> <br />who bid as follows: <br /> <br /> Item 1. The grading to e~ sub,grade ebd tbs laying <br />of a five ir.c) Portland Cement concrete pavement with <br />belt fInlsh we~rfng surface, complete with t~e furnish <br />lng of all necessary equipment, l~bor and m~,terio! on <br />an estimate of 10V51.46 square feet for tbs sum of <br />Twent~'-fotm ce~ts per square foo~. <br /> <br /> Item 2. The trenching and furnishing and laying of! <br />a 6" m~in line sewer complete with the furnishing cf <br />all necessar~~ equipment, labor and m~t erial on an esti <br />mate of 2~0 linear feet for the sum of One Dollar per <br />linear foot. <br /> <br /> Item Z. The trenching, furnishing and laying of <br />twelve four inch house branch sewers fr~m the <br />sewer to the ~urb line ~mplete with the f,]ruishing <br />ell necessary esipment, labor and material au an <br />estimate of 180 linear feet for the sum of seventy- <br />five cents per linear foot. <br /> <br /> Item 4. The construction of s flush tank complete <br />w~th th~ furnlzhing of sll necessary equipment, lobar <br />and mater~sl ~.r the ~m of One Hundred Twenty-five <br />Dollars. <br /> <br />On mot!on of Trustee Neff, seconded by Chapman and <br /> <br />carried, bid was taken under advisement for one week. ~ <br /> <br />This he'mc thc t~e and place fixed and set forth for. <br />the oDeu~ng of bids or proposals for tPe im~rovewent ~f <br />a port,on cf West N~neteenth Street, as briefly ~ <br />described i~ ~solution of Intention No.1268, and the~ <br />~rd of Trustees belng ~ly convened in o~en session; <br /> <br />proceeded to sndgid publicly o~ n, examine ~nd declare <br />all bids received. Only one bid w'ss received, b~ng <br /> <br />that of Stoele Finley, who bid as. follows: <br /> <br /> I*em 1. The grs~ ng to a sub-grade snd the laying! <br />of five (5) inch Asrhalttc Concrete pavement completeI <br />with the f~rnlshing of all necessary equipment, !abor: <br />~nd material on an estimate of 18,652 s~ore feet for <br />the sum of twenty-four cents per square foot. <br /> <br /> Item 2. The trencbIng, furn~sbing and laying of <br />three four ~nch house branch sewers from the m~in <br />sewer to tbs ~urb line complete with t?e f~rnishing <br />of 'll ~eceszary equipment, labor and material so an <br />estina te o¢ 51 linear feet for tbs sum of sixty cents <br />per lin. ft. <br /> <br /> Item Z. The construction of concrete curb complet <br />with tbs furnishing of o~l necessary equipment, labor <br />and materi~l on an estimate of 8 linear feet ~r the <br />s~m of slxty cents per linear foot. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.