My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1923 (#900-1161)
Clerk
>
Resolutions
>
CITY COUNCIL
>
1886 - 1951
>
1886-1951
>
1923 (#900-1161)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:47:40 PM
Creation date
4/15/2003 9:28:45 AM
Metadata
Fields
Template:
Pre-Charter
Year
1923
Pre-Charter - Doc Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) The excavation along the center line of <br /> <br />West Washington Avenue of a main sewer trench approxi- <br />mately six (6) feet deep and extending from the manhole <br />now Constructed at the point of intersection of the <br />center line of West Washington Avenue by the center li~e <br />of North Bristol Street east to the flush tank to be <br />constructed on the center line of West Washington Avenue <br />2500 feet east of the point of intersection of the <br />center line of West Washington Avenue by the center llne <br />of West Washington Avenue by the center line of NQrth <br /> <br />Bristol Street. <br /> <br /> The construction <br /> <br />eight (8) inch inside <br /> <br />in said main sewer trench of an <br />diameter vitrified salt gtszed <br /> <br />cylindrical main sewer pipe properly connected with the <br />manhole now constructed at the point of intersection of <br />the center line of West Washington AvenuS by the center <br />line of North Bristol Street properly connected with the <br />manholes and extending east and connected with the <br />manhole to be constructed st a point on the center line <br />of Nest Washington Avenue 1461.7V feet east of the point <br />of intersection of the center line of ~est Washington <br />Avenue by the center line of N~rth Bristol Street, also <br />the constructlo~ in said main sewer trench of a ~tx (6) <br />inch inside diameter vitrified salt g~aze~ cylindrical <br />main sewer p~e properly connected with the manhole to <br />be constructed on the center ~ine of ~est Washington <br />Avenue at a point 1461.~ feet east of the point of <br />intersection of the center line of West Washington Avenue <br />by the center line o2'~orth Bristol Street and extending <br />east properly connected with the manholes to and properly <br />connected with the flush ta~k to be constructed on the <br />center line of ~est ~ashington Avenue at a point 2800 feet <br />east of the point of intersection of the center line of <br />West Washington Avenue and the center line of ~orth <br />Bristol ~treet. <br /> <br /> The work audlimprovement which the Board of <br /> Trustees of t~e city of Santa Aha intends to or, er done <br /> and made in, on, ~nd ~long Morth Flower Street is briefly <br /> described as follows: <br /> <br /> (a) The excavation for and the construction of <br /> one concrete manhole on approximately the center line <br /> of North Flower Street at a point 332 feet north of the <br /> point of intersection of t~e center line of North Flower <br /> Street at a point 332 feet north of ~he point of inter- <br /> section of the center line of North Flower Street by the <br /> center line of West Fifteenth Street produced from the <br /> east; also the exc~vation for and construction of, on <br /> approximately the center line of North Flower Street, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.