Laserfiche WebLink
333 <br /> <br /> paving of said portion of roadway with a six (6) inch Port- <br /> laud cement concrete pavement. <br /> <br /> (d) The construction of cement curbs and curb <br />returns on portions of said ~est Fifth Street lying between <br />the West line of North Baker Street and the ~est line of <br />North Artesia Street, where same are not already constructe <br /> <br /> (e) The excavation of trench approximately eirht <br />(8)~Teet iu depth and the laying therein of one hundred and <br />eighty-one (lB1) feet of eight (8) inch main sewer pipe line <br />along the approximate center line of West Fifth Street and <br />connecting on the East with the main sewer now in place and <br />on the West with the six (6) inch n~in sewer line to be con- <br />structed as a part of this proceeding. <br /> <br /> (f) The excavation of trench approximately eight <br />(8) feet in depth and the laying therein of three hundred <br />(300) feet of six (6) inch main sewer pipe line along the <br />approxin~te center line of West Fifth Street connecting on <br />the East with the eight (8) inch main sewer line hereinbe- <br />fore referred to and on the West with the lamphole herein- <br />after referred to. <br /> <br /> (g) The excavation of sixty-two (62) lateral <br />house connection sewer trenches on that portion of the said <br />roadway of West Fifth Street lying between the West line of <br />North Baker Street and West line of North Artesia Street, <br /> <br />approximately six (6) <br />of such trenches of a <br />nectiug with the main <br />along the center line <br /> <br />feet in depth, and the laying in each <br />lateral house connection sewer, con- <br />sewer llne now in place approximately <br />of West Fifth Street, and extending <br /> <br />from said main sewer line to and inside of the existing <br />curb, ex, epilog therefrom any of said house connection sew- <br />ers already constructed. <br /> <br /> (h) The excavation of seventy-three (V3) lateral <br />house connection sewer trenches approximately mix (6) feet <br />in depth on that portion of the roadway of West Fifth S~reet <br />lying between the West line of North ~rtesia Street and the <br />West city limits line, and the laying in each of said tren- <br />ches of a lateral house connection sewer, connecting with <br />the r~iu sewer line now in ~lace or to be constructed apprcx <br />imately along the center line of West Fifth Street, and ex- <br />tending from said main sewer line to the North or South edge <br />of the twenty (20) foot strip of pavement proposed to be <br />constructed by this Resolution of Intention. <br /> <br /> (i) The excavation of a trench approximately <br />eight (8) feet in depth and the laying therein of an eight <br />(8) inch stub and sewer along the center llne of Hawley <br />~treet, extending from the main sewer line to be constructed <br />iu and along the center line of West Fifth Street to a poln~ <br />ten (10) feet North of the point of intersection of the <br /> <br /> <br />