Laserfiche WebLink
~thereof shall be graded and paved with asphaltic concrete pavement <br /> as particularly indicated on and in accordance with the plans and <br /> specifications hereinafter mentioned. <br /> <br /> All of said work to be as particularly indicated on and in <br /> accordance with the plans and specifications hereinafter mentioned. <br /> <br /> That all driveways shown on the plans to be paved shall be <br /> graded and paved with asphaltic concrete pavement for the~ entire <br /> width, and from the street side of the curb to the street side of the <br /> sidewalk, all as particularly indicated on and in accordance with the <br /> plans and spocifications hereinafter mentioned. <br /> <br /> The excavation for and construction of Portland cement <br /> concrete curbs upon and along the hereinbefore described portions of <br /> said street, where curbs do not now exist, or where replacements are <br /> to be made, e~cept that ~here shall be no curbs constructed along the <br /> East side of said street, from the Westerly extended South line of <br /> Apricot Street to ~he North line of Mcfadden Street, all as part- <br /> icularly indicated on and in accordance with the plans and spec- <br /> ifications hereinafter mentioned. <br /> <br /> The excavation for and construction of Portland cement <br /> concrete sidewalks upon and along the hereinbefore described portions <br /> of said street where sidewalks do not now exist, or where replacements <br /> are to be made, except that there shall be no sidewalks cc~structed <br /> along the East side of said street, from the Westerly extended south <br /> line of Apricot Street, to ~he North line of Mcfadden Street, all as <br /> particularly indicated on and in accordance with the plans and <br /> specifications hereinafter mentioned. <br /> <br /> The excavation for and construction of Salt Glazed Vitrified <br /> Clay Pipe main sewer stubs, together with manholes and all necessary <br /> appurtenances thereto shall be connected with the e~sting sewer <br /> along the hereinbefore described portion of Halladay Street, and <br /> extend to the East edge of the proposed pavement and at locations <br /> and grades, all as particularly indicated on and in accordance with <br /> the plans and specifications hereinafter mentioned. <br /> <br /> The excavation for and construction of salt glazed vitrifie~ <br /> clay pipe house connecting sewer, together with all eighth bends, disc <br /> seals and other necessary appurtenances thereto shall 0e constructed <br /> upon and along the hereinbefore described portions of said street, at <br /> depths and locations all as particularly indicated on and in accord- <br /> ance with ~he plans and specifications hereinafter mentioned. <br /> <br /> The excavation for and construction of genuine Byers wrought <br /> iron pipe house ss~-~ce connections, including all connections, <br /> corporation cocks, curb cocks, fittings and all necessary app~t- <br /> enances thereto shall ~e installed i~om the existing water main and <br /> also from the proposed water main at right angles thereto, extending <br /> to a point one foot back cf the curb and at such locations and depths <br /> ~s are indicated on ~he plans and specifications hereinafter mentioned <br /> <br /> <br />