Laserfiche WebLink
Environmental Signing and Striping and Traffic Signal <br /> Plans <br /> ECORP will provided the following environmental <br /> scope items: Cannon will verify conformance with applicable traffic <br /> engineering design standards, such as California <br /> • Review project plans, specifications, MUTCD, Caltrans Traffic Manual, Caltrans Highway <br /> environmental documentation, and relevant Design Manual, American Association of State <br /> permits to understand the proposed development's Highway, Work Area Traffic Control Manual, and <br /> scope and potential environmental impacts. National Association of City Transportation Officials <br /> • Confirm compliance with local, state, and federal Bikeway Design guide for bicycle facilities. <br /> environmental regulations, including, but not Our review will also assess various Intelligent <br /> limited to, the California Environmental Quality Transportation System (ITS) component designs <br /> Act (CEQA), Clean Water Act (CWA), Endangered (including changeable message signs, closed circuit <br /> Species Act (ESA), and air quality regulations. television, etc.), traffic safety studies, speed zone <br /> surveys, "red light" camera investigations, parking <br /> • Provide an environmental plan check report studies, demonstration projects, bicycle studies <br /> documenting findings, mitigation measures, and and facilities design, transit studies, truck studies, <br /> recommended conditions of approval. traffic studies for new development, and traffic signal <br /> • Confirm plans and specifications align with the coordination timing development. <br /> City's commitment to sustainable development We will verify that striping construction notes are <br /> and environmental stewardship, aiming to protect referencing the appropriate Caltrans Standard Plans <br /> natural resources. A20A through A20G for striping and A24A through <br /> A24H for pavement markings. We will also verify other <br /> Transportation/Traffic Studies traffic related items meet minimum standards, such as <br /> We will verify conformance to specific circulation lane widths, taper lengths, sign placement, crosswalk <br /> plans, including transportation management plans, width, etc. <br /> master plans of streets and highways, general <br /> circulation plans and coordination of these plans Street Lighting Plans <br /> with those developed by metropolitan planning Cannon will provide plans review for street lighting and <br /> organizations. voltage drop calculations in compliance with the City's <br /> Lighting Standards. Work will include public street <br /> } lighting plan checking and voltage drop calculation <br /> services in the City. There will be coordination <br /> with client and utility consultant to verify electrical <br /> service pedestal locations and street light standard <br /> specification. <br /> Voltage drop calculation services will include verifying <br /> rye <br /> voltage drop for branch circuits and adequate wire and <br /> conduit sizing for the street lighting project. Plan check <br /> requirements, specific City design guidelines for street <br /> lighting and conformance of current electrical, state, <br /> and jurisdictional standards/codes will be verified. <br /> I <br /> e No <br /> • Lannon <br />