Laserfiche WebLink
SECTION ... STATEMENT OF WORK <br />2.3.2 Project Management <br />Motorola will provide a Project Manager to serve as a single point of contact during <br />the implementation of the system. The Project Manager will: <br />1) Provide a single point of contact for all project issues <br />2) Schedule and allocate Motorola resources as required <br />3) Track and inventory equipment <br />4) Provide and update project schedule <br />5) Resolve product issues <br />6) Manage Motorola subcontractors <br />7) Attend SAPD project status meetings as required <br />8) Manage any required change orders <br />9) Confirm completion of ATPs <br />2.3.3 Equipment Installation and Set-up <br />2.3.3.1 RNC 3000 <br />Motorola will install the RNC 3000 on a desktop surface provided by SAPD, Tasks <br />included are: <br />1) Load and configure software for SAPD system configuration <br />2) Add site index and associated parameters <br />3) Configure the RNC database <br />4) Modify the RNC base link configuration database to support the existing base <br />station <br />5) Install, configure and test the RNC dial in console modem <br />OMO'TOFNOL-A Confidential and Proprietary 2 -:- 2 <br />