Laserfiche WebLink
aPPpppp� <br />f f <br />Proposal For <br />On -Call Water Resources Engineering Services <br />QC/QA Implementation. The QC/QA plan that Kimley-Horn and its team members will follow in the <br />execution of services prepared under this contract is currently being utilized successfully on our other <br />local public contracts and includes the following six key elements: <br />• Structure. Each QC/QA plan includes a project manager (responsible for the overall quality of the <br />project), technical managers (engineers responsible for discipline design development), and a QC/ <br />QA manager (responsible for verifying that the QC/QA plan is being implemented and followed). <br />• Procedures. Intra-disciplinary checking of documents will be performed by a competent individual <br />within each discipline other than the designer. <br />• Inter -Disciplinary Reviews. Inter -disciplinary reviews and coordination are performed throughout <br />the project and prior to key submittals, when senior staff from the various discipline groups are <br />brought together to discuss and comments on the interaction of the overall project elements. <br />• Quality Assurance Audit. The QC/QA manager will be responsible for conducting a quality <br />assurance audit after completion of the checking and review process and prior to the submittal of any <br />document or deliverable. <br />• Deliverables and Document Control. The project manager will manage the submission of design <br />documents after the QC/QA audit is complete and at milestone completion dates. <br />• Corrective Action Measures. Corrective action measures will be taken if incorrect or nonconforming <br />work is discovered in deliverable items that have already completed the QC/QA process. <br />e. Re1evant&roject.&xperienc1j <br />Kimley-Horn has enjoyed collaborating with the City on various civil, traffic, and transportation projects <br />in the past. From the Main Street Corridor Improvement, Warner Avenue Street Improvement, 17th <br />Street Grade Separation and Bristol Street SCE Corridor and OC Streetcar design review to the 5th <br />Street and Santa Boulevard Bike Lane, and Fisher Park Neighborhood Water Main Improvement <br />projects, Kimley-Horn has partnered with the City to provide exceptional service for critical projects. <br />We also currently provide construction support for the Main Street Corridor Improvement Project. Our <br />experience and lessons learned from these projects mean the City can expect the right balance of <br />technical expertise, responsiveness, and local knowledge to successfully complete your task order <br />assignments. Below, we have highlighted our other relevant project experience. <br />On -Call Road, Bridge, and Traffic Engineering Services, Orange County, CA <br />For more than a decade, Kimley-Horn has been providing the County of Orange Public Works <br />Department with civil and traffic engineering design services. From roadway improvements and <br />highway design to bicycle/pedestrian facilities and complete streets projects, Kimley-Horn has provided <br />the county with project management, design and planning services. The Kimley-Horn team has worked <br />directly with the County's in-house staff to provide outstanding as -needed civil engineering support for <br />these projects. Our team recently was selected for another term of the County's on -call program. <br />Year Completed: Ongoing <br />Client Name: County of Orange Public Works <br />Contact Information: Edward Frondoso, Construction Deputy Director, 714.245.4596 <br />Kimley-Horn Project Manager: Darren Adrian, P.E. <br />City of Santa Ana ' IWOC77003.22 Kimley>Morn 16 <br />