My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aftk <br />TAIT & Associates, Inc. <br />%9 On -Call Water Resources Engineering Services <br />Pipeline Management Program, FY2019-2020- <br />Phase 1 Project <br />Glendale Water & Power, Glendale, CA <br />TAIT was contracted to provide design build services with JDC for the <br />potable waterline project within the various residential neighborhoods of <br />Glendale, CA. The project was located in the residential streets in an area <br />of Glendale which required our team to develop construction documents <br />that could accommodate traffic during construction and a design that <br />would work with many existing utilities. The design involved the <br />preparation of plans and specifications for approximately 9,951 linear feet <br />of 8-inch water pipeline and 1,584 linear feet of 12-inch water pipeline. <br />TAIT provided the design services along with topographical survey of the <br />neighborhood. Due to the numerous existing utilities and mains within <br />the project, detailed designs were provided to ensure adequate clearance <br />between all utilities. TAIT met and discussed with many of the utility <br />surveyors in order to ensure the final design and construction was <br />approved by all. <br />Pipeline Management Program, FY2018- <br />2019-Phase 1 Project <br />Glendale Water & Power, Glendale, CA <br />TAIT was contracted to provide design build services with JDC for the <br />potable waterline project within the various residential neighborhoods of <br />Glendale, CA. The project was located in the residential streets in an area <br />of Glendale which required our team to develop construction documents <br />that could accommodate traffic during construction and a design that <br />would work with many existing utilities. The design involved the <br />preparation of plans and specifications for approximately 12,406 linear <br />feet of 8-inch water pipeline and 480 linear feet of 12-inch water pipeline. <br />TAIT provided the design services along with topographical survey of the <br />neighborhood. Due to the numerous existing utilities and mains within <br />the project, detailed designs were provided to ensure adequate clearance <br />between all utilities. TAIT met and discussed with many of the utility <br />surveyors in order to ensure the final design and construction was <br />approved by all. <br />Reference Contact: <br />Maria Fraser, PE, CIP <br />Engineering Manager <br />13220 Central Avenue <br />Chino, CA 91710 <br />(909) 334-3310 <br />mfraser@cityofchino.org <br />Client: <br />City of Chino <br />Construction Cost: <br />$2.1 million <br />Design Cost: <br />$134,998.75 <br />Project Dates: <br />2018-2022 <br />Project Team: <br />PIC: Jacob Vandervis <br />PM: David Sloan <br />PE: Bart Mink <br />Reference Contact: <br />Coleman Johnson <br />141 N. Glendale Ave. <br />Glendale, CA 91206 <br />(818) 551-6910 <br />ciohnson@glendaleca.gov <br />Client: <br />Glendale Water & Power <br />Construction Cost: <br />$4.4 million <br />Design Cost: <br />$193,796 <br />Project Dates: <br />Design: 2019-2020 <br />Construction: 2020 <br />Project Team: <br />PIC: Jacob Vandervis <br />PM/PE: Samantha Wohlfarth <br />QA/QC: David Sloan <br />`TAIT <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.