<br />On motion of Councilman McBride, seconded by Jerome and carried, the
<br />
<br />Clerk was authorized to open bids for the furnishing of 20,000 feet
<br />
<br />6 inch Cast Iron Pipe, as follows:
<br />
<br />Bid of American Cast Iron PiPe Company:
<br />Bond in the sum of $3,600.00.
<br />20,000 ft. 6" Bell and Spigot Mono-Cast
<br />"Enameline" centrifugal pipe, Class 150,
<br />in 16~ lengths, for.150 pounds working
<br />pressure, per foot $1.64~ $ 32,920.00.
<br />Price f.o.b, foundries Birmingham, Alabama with
<br />full freight allowed to Santa Ana, and for truck
<br />delivery to City storeyard, or Jobeite. Price
<br />includes California State Use Tax of 3% on foundry
<br />value, and terms are net thirty days. Complete delivery in 30 days.
<br />
<br />Bid of United States Pipe and Foundry Company:
<br />Bond in the sum of $5,000.00.
<br />ApprOx. 20,000 lineal feet of 6 inch, Class 150,
<br />centrifugally cast, Bell and Spigot, Cast Iron
<br />Pipe, 18-foot lengths, made to conform with Federal
<br />Specifications WWw- -p 421, Type I, Seal coated cement
<br />mortar lined i~side of 1/l~" minimum thickness,
<br />coated outside. $$ 1.636 $32,?20.00
<br />California State Sales Tax on foundry
<br />value (3% of $30,129.23) 903.88
<br />Total including sales tax $33,623.88
<br />F.0. ~ foundry Decoto, California, with full
<br />cartage allowed to on trucks, Santa Ana.
<br />Terms: Net cash thirty days.
<br />Delivery: Begin thirty days; complete within
<br />sixty days, all after receipt of order.
<br />
<br />Bid of Pacific States Cast Iron Pipe Company:
<br />Bond in the sum of 10%.
<br />20,000~ 6"xl8~ Claes 150 Bell and Spigot, Thin
<br />cement lined, Cast Iron Pipe, seal coated, Federal
<br />Specifications ~W-P-421, Type I.
<br />Price f.o.b, foundry, Ironton, Utah $1.4417 ft.
<br />Sales Tax .0433 ft.
<br />Full freight charges .2033 ft.
<br />Total 1.6883 ft.
<br />Price includes full rail freight and trucking charges
<br />to Jobslte or to City Yard in Santa Aha as well as the
<br />3% sales tax which applies. Terms are 30 days net.
<br />Shipment could be made within approximately three weeks
<br />after receipt of order.
<br />
<br />Bid of James B. Clew & Sons:
<br />Bond in the sum of $3500.00.
<br />20,000 ft. 6"x18~ B&S Class 150 Pipe $ $1.237 per ft.
<br />f.o.b, foundry
<br /> · 037 3% Use Tax
<br /> ~R&W Freight & T~uck
<br />Net price is f.o.b. Foundry with California Use Tax and
<br />R & W freight and trucking prepaid to Santa Aha based
<br />on present tariff rates. Terms ~0 days net. Shipment
<br />in about 30 days and complete in60 days.
<br />
<br />On motion of Councilman McBride, seconded by Jerome and carried, the
<br />
<br />bids were referred to the Manager and Assistant Engineer for report.
<br />#
<br />
<br />On motion of Councilman Jerome, seconded by Do~hl and carried, the
<br />
<br />Clerk was authorized to open bids for the furnishing of an accounting
<br />
<br />machine, as follows:
<br />
<br />Bid of National Cash Register Company:
<br />Machine "A" $3,535.00
<br />Machine "B" $6,370.00
<br />Delivery will be completed not less than
<br />180 days on Machine "A"; delivery will be
<br />completed not less than 360 days on Machine "B".
<br />
<br />Bid of Burroughs Corporation:
<br />One accountiD~ machine $2,870.10
<br />Delivery will be completed not less than
<br />150 days after award.
<br />
<br />On motion of Councilman McBride, seconded by Jerome and carried, the
<br />
<br />bids were referred to the Manager and Purchasing Agent for report at
<br />their early convenience.