My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />3.02 PROJECT PHASING AND LANE REQUIREMENTS ...................................NOT USED <br />3.03 ADVANCED WARNING SIGNS <br />A. CHANGEABLE MESSAGE SIGNS (CMS) <br />The Contractor shall provide 2 solar powered CMS two weeks prior to commencement <br />of construction. The signs shall be posted in advance of each end of the project for the <br />duration of the project. These CMS can be LED full matrix or letter matrix or <br />equivalent, with preferred 8" letter (minimum 6"). The overall width of the sign <br />including the trailer shall not exceed 8'. <br />• Prior to the start of the construction, display the following message: <br />Screen 1: <PROJECT STREET NAME> CONSTR <br />Screen 2: BEGINS xx/xx/xx <br />• When construction started, display the following message: <br />Screen 1: <PROJECT STREET NAME> UNDER CONSTR <br />Screen 2: USE ALT ROUTE <br />The messages and sign location may be changed at any time as determined by the <br />Engineer. <br />B. STATIC WARNING SIGNS <br />The Contractor shall post 2 static advance warning signs at least two weeks prior to <br />commencement of construction stating: <br />MAJOR ROAD CONSTRUCTION ON <br /><PROJECT STREET NAME> <br />FROM <DATE> TO <DATE> <br />EXPECT DELAYS <br />USE ALTERNATE ROUTE <br />The signs shall be posted in advanced of each end of the project. These warning signs <br />shall be sized (5' height by 6'wide minimum) to fit the above wordings with orange <br />reflective background, black border and 7" black letters. If sign is installed on the <br />sidewalk, there shall be enough clearance for pedestrian access underneath the sign. <br />The Engineer will determine sign placement and the dates. <br />In the event of construction delays that go beyond the posted completion date on the <br />sign, the contractor shall keep the completion date on the sign updated on a monthly <br />basis or as directed by the Engineer. <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.