My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />3.04 TRAFFIC CONTROL PLAN PREPARATION AND SUBMITTAL <br />Prior to start of project, the contractor shall submit traffic control plan for approval on all <br />construction phases and/or stages. The traffic control plan shall be prepared by registered <br />Traffic/Civil Engineer specializing in Traffic Control. Unless directed otherwise, the <br />traffic control plan shall conform to the format and requirements identified in the City of <br />Santa Ana Standard Plan No. 1125F. <br />The submittal and review process is as follows: <br />• Within 1 week of receiving Award of Contract, contractor shall meet with the City <br />to discuss the proposed traffic control plan and construction phasing <br />• Traffic control plans must be submitted within 4 weeks of receiving Award of <br />Contract. <br />• The City will review all I st submittal in 2 weeks. <br />• The City will review subsequence re -submittal with check print in 1 week. <br />• Contractor may submit traffic control plan for each Phase separately. <br />• Approval of the traffic control plan may take more than 2 submittals depending on <br />the completeness and thoroughness of the plan. <br />• Incomplete traffic control plan will be rejected without reviewing. The City will <br />not be responsible for any delay of the project due the incomplete submittal of the <br />traffic control plan. <br />3.05 PAYMENT <br />Payment for all traffic control, including but not limited to providing the CMS, preparing <br />traffic control plan, sandblasting, barricades, temporary striping, move -ins, and the above <br />warning signs shall be included in the other items of work involved and no additional <br />compensation will be allowed therefore. <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.