Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />4.08 SERVICE <br />The Service Cabinet shall be aluminum clear anodized Type III -BF, 2 Wire 120V, wired <br />for both traffic metered and unmetered circuits as follows: <br />• 100A main bus with 4-circuit interior metered and 4-circuit interior un-metered. <br />• Traffic Signal Metered Circuits: <br />0 30A for Traffic Signal <br />0 30A Spare. <br />0 15A Spare. <br />• Un-Metered Circuits: <br />o 30A for Safety Lights. <br />• Type V Photo Electric Cell (PEC) with Delay <br />• Test Switch <br />In addition, cabinet and service cabinet meter shall be vinyl wrapped prior to installing in <br />the public right-of-way as follows: <br />a. Vinyl graphics theme and layout shall be reviewed and approved by Engineer prior <br />to printing and installing vinyl on cabinet and service cabinet meter. <br />b. Vinyl wrap graphics shall be printed on 3-M vinyl with Clean Slate Group graffiti <br />resistant laminate, manufactured by Econolite or approved equivalent. <br />c. Vinyl wrap shall be installed onto cabinet and service cabinet meter in strict <br />adherence to manufacturer recommendations and shall be free of air bubbles, <br />wrinkles, and/or lifted sections, edges, or corners. <br />The Contractor shall be responsible for all service details, coordinating and scheduling of <br />work and necessary connections in advance of need. <br />The City has incorporated Edison service design into the City's plan; however, it is the <br />contractor's responsibility to verify the service requirement and installation prior to work. <br />If any discrepancy exists between the plans and Edison design, the Edison design shall take <br />precedence. No additional compensation will be provided for the discrepancy. <br />Service address shall be engraved on placard per SCE requirements on both the front and <br />back of the service cabinet door. <br />Contractor shall obtain the necessary electrical permits from the Planning & Building <br />Agency for service cabinet installation, inspection and electrical service authorization. The <br />permit fee will be waived for City projects. City will provide Electrical Permit Fee Waiver <br />Memorandum to be presented to Planning & Building Agency at the time of obtaining <br />permit. <br />56 <br />