My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />If a conduit is bored or jacked across existing sewer mains or laterals, the contractor shall <br />conform to the following requirements: <br />1. Pothole to determine location and depth of the sewer mains and laterals. <br />2. Visual confirmation by City Inspector shall be done during the boring/jacking of <br />the conduit across the sewer mains or laterals for any damages prior to back filling <br />the pothole. <br />3. If visual confirmation is not done, the contractor shall perform Video Inspection of <br />Sewer Mains and Laterals per the following specifications. <br />a. Video Inspection of Sewer Mains and Laterals <br />The contractor shall use CCTV equipment to verify that City sanitary sewer <br />mains have not been impacted. This includes all mains that appear on the plan <br />of construction drawings as possible points of interference, regardless of the <br />relative elevation of the sewer and what is believed to be the elevation of the <br />newly constructed facility. <br />The contractor shall use equipment specially designed and constructed for <br />sewer inspection and televising. The camera must have light sources of suitable <br />illumination output to provide a clear picture of the entire periphery of pipe. <br />The camera must be able to be rotated to a position that will assure that the total <br />periphery of the sewer is in focus at all times, regardless of the diameter of the <br />pipe being inspected. The camera, transport system, and other components of <br />the video system shall be capable of producing a picture adequate for the <br />purposes of the inspection as stated herein. Video runs showing condensation <br />or submersion of the lens, poor or out -of -focus images, poor audio, or otherwise <br />poor image quality shall be cause for rejection and may necessitate re -televising <br />at the consultant's expense if the City determines the video run is not of <br />acceptable quality. <br />A cable footage counter, accurate to within one (1) foot in 1000 feet, shall be <br />used and shall be indicated on the monitor and recorded on the video. The date <br />of inspection, continuous forward and reverse readout of camera distance from <br />referenced access hole, the City supplied upstream and downstream <br />manhole identification number with an arrow indicating the direction of flow, <br />the size of the pipe, the name of the street, the time of day and the project or <br />location name as supplied by the City shall be displayed continuously on the <br />monitor and recorded on the video. The use of non-standard or incorrectly <br />numbered manholes by the contractor on the video overlay is cause for <br />rejection of the digital video and any costs associated with re-videoing of <br />the main that are necessitated by the contractor's failure to use designated <br />naming conventions will be borne entirely by the contractor. The footage <br />relative to the center of the manhole at the start of each run shall be set to <br />accurately reflect a center of manhole starting position of 0.00 feet regardless <br />of where along the pipe and at what footage the run begins. All video operations <br />65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.