Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />5.00 SPECIAL PROVISIONS - IRRIGATION, LANDSCAPING, & MAINTENANCE <br />PERIOD...........................................................................................................NOT USED <br />6.00 SPECIAL PROVISIONS - SANITARY SEWER IMPROVEMENTS <br />6.01 OPEN TRENCH OPERATIONS, EXCAVATION, BEDDING, AND BACKFILL <br />Open trench operations, excavation, bedding and backfill shall conform to the applicable <br />provisions of Section 306 of the Standard Specifications and these Special Provisions. <br />All trenches shall be base paved with hot mix or covered with steel traffic plates recessed <br />and flushed with existing pavement at the end of each working day. No temporary <br />pavement will be allowed. <br />Trenching operations shall not be allowed on more than one street at any time. Work shall <br />not be allowed in more than one intersection at any one time. <br />The third paragraph of Subsection 306-1.1.1 of the Standard Specifications is hereby <br />deleted and replaced as follows: <br />Excavation shall include the removal of all excess excavated materials and all water <br />and materials of any nature which interfere with the construction work. <br />All pavement removals shall be sawcut unless, approved otherwise by the Engineer prior <br />to commencement of work. <br />All removed pavement and excess excavated material shall be immediately disposed of off <br />the project site at a legal dumpsite at the Contractor's expense. <br />Pipe bedding: <br />Unless otherwise specified or shown on the plans, for VCP sewer the pipe bedding material <br />shall be 3/4" crushed rock; if installed in high groundwater conditions the bedding material <br />shall be'/2" crushed rock wrapped in geofabric (Mirafi 140N or approved equal). For PVC <br />and ductile iron pipe sewers, the pipe bedding material shall be imported SE-30 sand. <br />Pipe Zone Backfill: <br />Unless otherwise specified or shown on the plans, for VCP sewer, the pipe zone backfill <br />material shall be 3/4" crushed rock; if installed in high groundwater conditions the pipe zone <br />backfill material shall be 1/2" crushed rock wrapped in geofabric (Mirafi 140N or approved <br />equal.) For PVC and ductile iron pipe sewers, the pipe zone backfill material shall be <br />imported SE-30 sand. <br />Trench Zone Backfill: <br />The trench zone backfill shall be Class II aggregate base. <br />