My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />Pipe bedding and trench backfill shall be accomplished in accordance with the City of <br />Santa Ana Standard Plan No. 1150, these Special Provisions, and the trench details on the <br />construction drawings. For VCP sewers, the pipe zone and bedding material shall be 3/4- <br />inch crushed rock. For VCP sewers in high groundwater conditions, the pipe zone and <br />bedding material shall be 1/2" crushed rock wrapped in geofabric (Mirafi 140N or approved <br />equal). For PVC pipe and ductile iron pipe sewers, the pipe zone and bedding material <br />shall be imported SE-30 sand. The trench zone backfill shall be Class II aggregate base. <br />All material tickets (i.e. Sand, Class II Base, Crushed Rock, Asphalt, Concrete, etc.) shall <br />be given to the City Inspector on a daily basis. <br />No backfill shall be placed until the sewer pipe laid has been approved by the City <br />Inspector. <br />Crushed rock products shall be in accordance with subsection 200-1.2 and Table 200- <br />1.2(A) of the Standard Specifications. <br />The seventh and eighth paragraphs of Subsection 306-1.3.1 of the Standard Specifications <br />are hereby deleted and replaced with the following: <br />Rocks greater than 4 inches in any dimension will not be permitted in backfill <br />placed between 1-foot above the top of any pipe and 1-foot below pavement <br />subgrade. <br />Backfill around sewer manhole and structures shall be sand placed a minimum of <br />2' laterally around structure and backfilled to subgrade. <br />The following test methods shall be used for determining relative compaction: <br />California Test 216 (Sand Cone Method) <br />California Test 231 (Nuclear Gauge Method) <br />The Contractor will be provided with compaction test at locations deemed necessary by the <br />Engineer. <br />If compaction fails to meet the Contract Specifications, then the Contractor shall make the <br />necessary adjustments and is responsible for the cost of additional compaction tests until <br />compaction per the specifications is met. <br />All trench and structure backfill sand, crushed rock and Class II aggregate base and native <br />material shall be compacted to 95% of maximum density at optimum moisture. <br />If any trench, through the neglect of the Contractor, is excavated below the grade required <br />by the plans and these Special Provisions, it shall be refilled to grade with additional <br />bedding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.