My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />existing sewer pipes, drop inlets, PCC encasements, etc., necessary to construct each <br />manhole structure complete in place. <br />Concrete for manhole structures shall be Class 560-C-3250. All reinforcing steel used in <br />these structures shall be Grade 40 minimum. Fly ash additives and/or substitutes shall not <br />be permitted. <br />The following is hereby added to Subsection 201-4.1, of the Standard Specification: <br />Concrete curing compound shall be Type 2. <br />The following is hereby added to Subsection 303-1.1, of the Standard Specification: <br />Once any excavation for the construction of a manhole structure is commenced, the <br />Contractor must diligently pursue the completion of the structure, including <br />structure backfill, compaction, and restoration of surface improvements and <br />temporary paving. Open excavations shall be properly barricaded, backfilled or <br />covered with steel traffic plates to the satisfaction of the Engineer at the end of each <br />workday. <br />For new manholes on large sewer mains, or for manholes with extreme depths of cover, a <br />larger diameter manhole will be required. The design of these larger manholes shall be <br />reviewed with and approved by the Water Resources Division. The larger manhole cover <br />shall be in accordance with Standard Plan No. 1211 and these Special Provisions. <br />For larger manhole frames and covers, the Water Resources Division may require frames <br />and covers fabricated of fiber reinforced polymer (FRP). These larger FRP manhole frame <br />and cover sets shall be manufactured by GMI Composites, Inc., no equal. <br />The FRP frame and cover system shall meet the following requirements: contain 45 percent <br />to 70 percent fiber reinforcement; thermoset resin with UV inhibitors to prevent photo <br />degredation; minimum strength to weight ratio of 750:1; integrated gasket to minimize <br />traffic shock, abate noise and orders and prevent water entry into manhole; skid slip <br />resistance greater than 0.6 as described in ASTM C 1028 Standard; and dimensional <br />tolerance of 1/16-inch. <br />The FRP frame and cover shall be designed to exceed AASHTO H-20 loading by a factor <br />of 2.5 (125,000 pounds) and shall meet AASHTO EN124 D400 loading (89,924 pound <br />which exceeds AASHTO Proof Load of 50,000 pounds for severe traffic service) proof <br />load on a 250 mm round plate for 30 seconds. Documentation of certified testing results <br />shall be submitted including complete Fatigue Loading Test with no loss of carrying <br />r•: <br />
The URL can be used to link to this page
Your browser does not support the video tag.