My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As further described in Exhibit A, the scope of work includes installation of a new traffic signal at the <br />intersection of Segerstrom Avenue & Rosewood Avenue, including traffic signal poles, conduit, wiring, <br />fiber optic cable, video detection system, signage and striping, and necessary roadway and sidewalk <br />improvements. In addition, high visibility crosswalks and audible pedestrian signals will be installed to <br />enhance visibility of crossing pedestrians and bicyclist at the intersection. These Project improvements <br />will provide a signalized controlled intersection which will enhance the safety of pedestrians and <br />motorists when traversing this intersection. <br />II. MUTUAL RESPONSIBILITIES: <br />The Parties mutually agree to: <br />a. Designate lead staff to act as the liaisons for the Project. The liaisons and any other Project <br />personnel, if necessary, will attend and participate in all related Project meetings. <br />b. Participate, cooperate and coordinate with contractors, consultants, vendors and staff in good <br />faith using reasonable efforts to resolve any unforeseen issues and disputes arising out of the <br />Project to the extent practicable with respect to the performance of the Project. <br />c. Provide on -site support for signal control systems, timing plans, detection systems and related <br />equipment during construction, installation and integration, and be available to change or adjust <br />timing plans when necessitated by the Project. <br />d. Coordinate the inclusion of other reasonably necessary improvements and in -kind services that <br />the District requires for the implementation of the Project but are not included in the Project <br />plans and specifications. District shall be responsible for the inclusion of such elements at its <br />own cost. <br />III. RESPONSIBILITIES OF CITY: <br />City agrees to the following responsibilities: <br />a. Preparation of Notice Inviting Bids to elicit competitive bids from qualified contractors for <br />Project construction. <br />b. Bid analysis of proposals from qualified contractors and selection of a contractor based on same. <br />c. Awarding of construction contract to selected contractor. <br />d. Invoicing for Project to District. <br />e. Construction contract administration and management. <br />f. Periodic inspections of contractor progress, as well as labor law compliance. <br />g. Processing of contractor progress payments. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.