My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />Engineer weekly to facilitate timely assessment and coordination of upcoming construction <br />activities. <br />6-6 SUSPENSION OF THE WORK <br />6-6.1 General <br />Add the following to this subsection: <br />Should suspension of work be ordered by reason of the failure of the contractor to carry out orders <br />or to perform any provisions of the contract; or by reason of weather conditions being unsuitable <br />for performing any item or items of work; the contractor, at its expense, shall do all the work <br />necessary to provide a safe, smooth, and unobstructed passageway through construction for use by <br />public traffic during the period of such suspension. In the event that the contractor fails to perform <br />the work above specified, the City will perform such work and the cost thereof will be deducted <br />from payment due or to become due to the contractor. <br />If a suspension of work is ordered by the Engineer, due to the failure on the part of the contractor <br />to carry out orders given or to perform any provision of the contract, the days on which the <br />suspension order is in effect shall be considered working days. <br />SECTION 7 - MEASUREMENT AND PAYMENT <br />7-2 LUMP SUM WORK <br />Add the following to this subsection: <br />Contractor shall submit for approval a schedule of values for all lump sum work. Failure to submit <br />may delay payment for said work. <br />7-3 PAYMENT <br />7-3.1 General <br />Add the following to this subsection: <br />Payment for any items of work required by the plans, specifications or other contract documents, <br />which are not covered by a contract bid item, shall be considered as included in other items and <br />no additional compensation shall be paid therefore. <br />7-3.4 Mobilization <br />Add the following to this subsection: <br />Mobilization shall consist of preparatory work and operations including, but not limited to, those <br />necessary for the movement of personnel, equipment, supplies and incidentals to the project site. <br />Mobilization shall additionally include the establishment of any temporary facilities, utilities, <br />construction fencing and barricades, and the provision and installation of project signs. <br />A minimum of one week before the start of construction, the Contractor shall video all areas where <br />construction is to take place. The video shall be supplied to the Engineer before constructions <br />
The URL can be used to link to this page
Your browser does not support the video tag.