My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> placed for each direction of traffic. Sign sizes shall be 30"minimum.Locations of the signs <br /> shall be as directed by the Engineer. <br /> The contractor shall be responsible for any additional temporary wiring, which may be <br /> required on a day-to-day basis due to the construction. <br /> 4.07 TURN-ON AND FUNCTIONAL TESTING <br /> The Inspector shall be notified at least five (5) working days before the intended turn-on <br /> and provide method and schedule of turn-on procedure. <br /> The Inspector shall be notified a minimum of two work days in advance of planned <br /> connection of the new or modified traffic signal to the traffic signal communications <br /> system, if the new or modified traffic signal is to be connected to the traffic signal <br /> communications system. <br /> All permanent striping,pavement markings,and signing shall be in place prior to beginning <br /> of the Functional Test Period for any new or modified traffic signal system. The Contractor <br /> shall complete all sandblasting, striping, pavement markings, and roadside signing <br /> installations and modifications shown on the plans prior to beginning the Functional Test <br /> Period. <br /> The Contractor shall at his own expense, arrange to have a technician,qualified to work on <br /> the equipment listed below and employed by the equipment manufacturer, or his <br /> representative,present at the time the equipment is turned on: <br /> 1. Traffic signal controller and cabinet assembly <br /> 2. Video detection equipment(if applicable) <br /> 3. Emergency vehicle preemption equipment(if applicable) <br /> 4. Uninterruptible power supply equipment(if applicable) <br /> 5. Transit Signal Priority equipment(if applicable) <br /> The Engineer shall be notified at least two working days prior to the beginning of the <br /> functional test period. <br /> The Functional Testing Period of the modified traffic signal system shall not be made on <br /> Friday, Saturday, Sunday, or the day preceding or following a Federal holiday. The <br /> Engineer shall be notified at least two working days prior to the beginning of the Functional <br /> Testing Period. The Functional Testing Period will not be allowed to begin without prior <br /> authorization by the Engineer. <br /> 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.