Laserfiche WebLink
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> 4.08 SERVICE <br /> The Service Cabinet shall be aluminum clear anodized Type III-BF, 2 Wire 120V, wired <br /> for both traffic metered and unmetered circuits as follows: <br /> • 100A main bus with 4-circuit interior metered and 4-circuit interior un-metered. <br /> • Traffic Signal Metered Circuits: <br /> o 30A for Traffic Signal <br /> o 30A Spare. <br /> o 15A Spare. <br /> • Un-Metered Circuits: <br /> o 30A for Safety Lights. <br /> • Type V Photo Electric Cell(PEC)with Delay <br /> • Test Switch <br /> In addition, cabinet and service cabinet meter shall be vinyl wrapped prior to installing in <br /> the public right-of-way as follows: <br /> a. Vinyl graphics theme and layout shall be reviewed and approved by Engineer prior <br /> to printing and installing vinyl on cabinet and service cabinet meter. <br /> b. Vinyl wrap graphics shall be printed on 3-M vinyl with Clean Slate Group graffiti <br /> resistant laminate, manufactured by Econolite or approved equivalent. <br /> c. Vinyl wrap shall be installed onto cabinet and service cabinet meter in strict <br /> adherence to manufacturer recommendations and shall be free of air bubbles, <br /> wrinkles, and/or lifted sections, edges, or corners. <br /> The Contractor shall be responsible for all service details, coordinating and scheduling of <br /> work and necessary connections in advance of need. <br /> The City has incorporated Edison service design into the City's plan; however, it is the <br /> contractor's responsibility to verify the service requirement and installation prior to work. <br /> If any discrepancy exists between the plans and Edison design,the Edison design shall take <br /> precedence. No additional compensation will be provided for the discrepancy. <br /> Service address shall be engraved on placard per SCE requirements on both the front and <br /> back of the service cabinet door. <br /> Contractor shall obtain the necessary electrical permits from the Planning & Building <br /> Agency for service cabinet installation, inspection and electrical service authorization. The <br /> permit fee will be waived for City projects. City will provide Electrical Permit Fee Waiver <br /> Memorandum to be presented to Planning & Building Agency at the time of obtaining <br /> permit. <br /> 56 <br />