My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> Cables shall be tested at the factory to ensure the cable complies with the specifications. <br /> Reels of cable shall be tested for insulation breakdown and continuity prior to <br /> installation in ducts. <br /> As a post-installation check,the Contractor shall measure the continuity and insulation <br /> breakdown of the cable pairs in each length of cable after installation, prior to <br /> connection. The Contractor shall measure these parameters on a minimum of two pairs <br /> selected by the Engineer. The same pairs shall not be measured on consecutive lengths. <br /> The Contractor shall record the reel number from which the cable came, the <br /> identification of the pairs measured, and the results of continuity and insulation tests. <br /> The Contractor shall carry out system integration testing to ensure that the twisted-pair <br /> cables perform as specified when used in operation with equipment installed under the <br /> contract. <br /> Where splicing is required inside the pull box or splice vault, the Contractor is <br /> responsible for supplying the splice kits and all accessories including bond connectors <br /> and proper end plates to provide splices as recommended by the manufacturer. Unless <br /> noted otherwise, splice kit shall be COYOTE Series manufactured by Performed Line <br /> Products, www.preformed.com. All splicing shall be done by the Contractor,the City <br /> will supply necessary wiring information or splicing diagram. <br /> Individual wire splicing shall be done using weather resistant connector (AMP <br /> Picabond Connector. <br /> B. FIBER OPTIC CABLE <br /> This work consists of installation of Single Mode Fiber Optic Cable per plan. <br /> This work shall be in accordance with the Plans, Section 87-19, "Fiber Optic Cable <br /> Systems," of the Caltrans Standard Plans & Specifications and these Special <br /> Provisions. <br /> Each fiber optic cable for this project shall be Corning Cable Systems, ALTOS Lite <br /> Gel-Free Cables, Single-Jacket/Single-Armor type,loose tube and contain single mode <br /> (SM) dual-window (1310 nm and 1550 rim) fibers as shown on the Plans and shall <br /> conform to these special provisions. <br /> The drop cables shall be connectorized with SC connectors in the cabinets. This shall <br /> require additional aramid strength members in the cable or the use of furcation tubing <br /> at the terminus. <br /> 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.