CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> SECTION 3 - CONTROL OF THE WORK <br /> 3-5 INSPECTION <br /> Add the following to this subsection: <br /> City inspection occurs during construction working hours. Inspection work requested by the <br /> contractor outside of the prescribed working hours shall be paid by the contractor at the City's <br /> overtime rate. <br /> 3-7 CONTRACT DOCUMENTS <br /> 3-7.1 General <br /> Add the following to this subsection: <br /> The Contractor shall maintain a control set of plans and specifications within Procore at all times <br /> throughout the construction period. As approved by the Engineer, all fmal locations determined <br /> in the field and any deviations from the plans and specifications shall be marked in red on this <br /> control set to show the As-Built conditions. Updates to the control set shall be submitted to the <br /> Engineer prior to each monthly progress payment. Upon completion of all work, the Contractor <br /> shall submit the control set As-Built Plans and report to the Engineer through Procore. <br /> Additionally, the Contractor shall provide the following: <br /> Street Improvements: Any deviations from the contract plans such as: alignments, and <br /> appurtenance locations shall be noted (drawing sketch) on the control plan and a copy submitted <br /> to the Engineer no later than(5)working days from the occurrence. <br /> Storm Drain Improvements: Any deviations from the contract plans such as: alignments, <br /> elevations, modifications to pipe/structures sizing/material. <br /> Sewer Improvements: Any deviations from the contract plans such as: alignments, elevations, <br /> modifications to pipe/structures sizing/material. Contractor shall also provide CCTV inspection <br /> recordings/videos in format required by Engineer. <br /> Water Improvements: Any deviations from the contract plans such as: alignments and <br /> appurtenance locations shall be noted (drawing sketch) on the control plan and a copy submitted <br /> to the Engineer no later than(5)working days from the occurrence. <br /> Traffic Improvements: Any deviations from the contract plans such as: location of poles, pull <br /> boxes and runs, depth of conduits, number of conductors, and other appurtenant work, for future <br /> reference. <br /> Within(15) days of completion of all work, the Contractor shall submit the control set of as-built <br /> plans to the Engineer. Final payment will not be made until this requirement is met. <br /> 3-8 SUBMITTALS <br /> Add the following to this subsection: <br /> All submittals shall be delivered through Procore. <br /> 7 <br />