My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> 3-10 SURVEYING <br /> 3-10.1 General <br /> The following supersedes the provisions of this subsection: <br /> The Contractor shall be responsible for directly obtaining the services of a California Licensed <br /> Land Surveyor to be in responsible charge of all survey work performed under this contract. <br /> The Contractor shall be responsible for the scheduling of all survey requests. <br /> The Contractor's Surveyor shall provide construction staking for project improvements. A copy <br /> of the cut sheets shall be provided to the AGENCY for verification. Also a copy of all updated <br /> control set by the Contractor's Surveyor; showing coordinates, elevation, and description shall be <br /> submitted, for quality management(as-built checks by Agency). <br /> The AGENCY will provide construction plans and specifications for the project. Construction <br /> stakes shall be set per the provided plans and specifications.The Contractor's Surveyor shall notify <br /> the AGENCY immediately of any discrepancy or design errors discovered on the plans during <br /> staking or when verifying join points. <br /> The Contractor's Surveyor shall research existing County and City records for centerline survey <br /> monuments within the project area. Prior to construction, all monuments shall be tied-out and a <br /> Corner Record shall be recorded with the County Surveyor per Section 8771 of the Business and <br /> Professions Code of the State of California. After completion of construction, any monument <br /> disturbed or lost during construction shall be reset, in conformance with Section 8771. Each <br /> centerline intersection shall be drawn on a single Corner Record. A copy of all Corner Records <br /> shall be submitted to the AGENCY prior to a Notice of Completion being filed. <br /> The Contractor is responsible for maintaining a safe and orderly job site per Occupational Safety <br /> and Health Administration(OSHA) standards. <br /> The Contractor shall furnish traffic control as needed to provide a work area free of public and <br /> construction traffic for construction staking. Traffic control shall conform to the requirements of <br /> the "Watch Area Traffic Control Handbook" (WATCH). Payment for said work shall be included <br /> in the other items of work and no additional compensation will be allowed. <br /> 3-11 CONTRACT INFORMATION SIGNS <br /> Add the following to this subsection: <br /> Contractor shall furnish,install and maintain a project advertisement sign as detailed in the Appendix <br /> of the Contract Documents. The Contractor shall install the project advertisement sign during <br /> construction in the location approved by the Engineer. The maintenance includes replacement (if <br /> damaged due to the operations of the Contractor)and graffiti removal. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.