Laserfiche WebLink
61. (4) <br /> <br />In order to make improvements at the intersection of Main Street at Town and Country <br />Road, the applicant shall contribute $350,000 to fund the following improvements: <br /> <br />Acquire approximately 2,100 square feet of additional right-of-way on the north- <br />west side of the west leg of Town and Country Road, in the City of Santa Ana, <br />to provide dual left-turn lanes, two through lanes, and two receiving lanes. <br /> <br />b. Replace approximately 27 parking spaces for the Main Place site to accommodate <br /> the alignment and restriping of the roadway. <br /> <br />c. Stripe the east leg for dual left-turn lanes, two through lanes, and two receiving <br /> lanes. <br /> <br />d. Modify the signal to accommodate the recommended improvements. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to Phase I building permit <br /> <br />Method of Verification <br /> <br />Written verification <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />Owens Drive Improvements <br /> <br />62. (5) The applicant shall widen Owens Drive between Main Street and Lawson Way. <br /> Ultimately, the improvement will result in Owens Drive being a six-lane roadway with <br /> a raised median from Broadway to Lawson Way, which will make a transition to four <br /> lanes with a raised median to the eastern city limits. The intersection of Owens Drive <br /> at Main Street will be improved to provide dual left-turn lanes, three through lanes and <br /> a separate right-turn lane on the westbound approach of Owens Drive at Main Street, <br /> and dual left-turn lanes and three through lanes on the eastbound approach of Owens <br /> Drive and Lawson Way. The interim improvement to occur with project Phase l prior <br /> to acquisition of the right-of-way on Owens, west of Main Street, will include dual left- <br /> turn lanes, two through lanes, and'a right-turn only lane on the Owens Drive <br /> westbound approach at Main Street. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to May 1993 <br /> <br />Method of Verification <br /> <br />Inspection and Acceptance <br /> <br />Responsible Parties <br /> <br />Executive Director, Public Works <br />Agency <br /> <br />]B3/S:I 1340001 .MM A-30 <br /> <br /> <br />