My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-021 - Final Environmental Impact Report for the North Harbor Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:59 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-21
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
390 RESOLUTZON 94-021 <br /> <br />option 1 - Beautification. <br /> <br />Under this alternative, existing General Plan land use and <br />circulation policies would be implemented; Harbor Boulevard would <br />be devoted primarily to general strip commercial development. <br />Improvements to the internal circulation system as identified in <br />the General Plan would be implemented including various street <br />widenings and intersection improvements. Circulation improvements <br />identified in the General Plan are incorporated by reference. <br /> <br />Additionally, this alternative would propose the following visual <br />improvements: Introduction of strong avenue tree planting; <br />landscaping of central medians with trees shrubs and grass; <br />improvements to all major intersections by the introduction of <br />special paving, feature tree planting and additional landscaping <br />along property frontages; landscaping and boundary improvements to <br />vacant lot frontages; landscaping of wide property setbacks; and <br />entry monuments and other features to identify the area. <br /> <br />Impacts to the following would be similar to the proposed Specific <br />Plan: Air quality, soils and geology, hydrology and drainage, <br />traffic and circulation, noise, land use, aesthetics, light and <br />glare, public services and utilities, population, housing and <br />employment, and cultural resources. <br /> <br />Traffic demand control measures, however, would be more easily <br />implemented under the proposed Specific Plan than under this <br />alternative because the proposed Plan encourages larger scale <br />developments than would be anticipated under the General Plan. <br /> <br />It should be noted that the General Plan does not allow residential <br />development along Harbor Boulevard, while the proposed Specific <br />Plan does. Therefore, the potential for adverse noise impacts is <br />decreased with this alternative decreases with this alternative due <br />to the location of these sensitive receptors. <br /> <br />While this alternative would significantly improve conditions over <br />those presently existing on the site, fragmented parcelization <br />patterns and cluttering of unrelated and incompatible land uses <br />would continue. <br /> <br />The beneficial impacts resulting from this alternative would be <br />less than the proposed Plan. <br /> <br />LONG RANGE CONCEPT - MORE INTENSE COMMERCIAL AND OFFICE DEVELOPMENT <br />ALTERNATIVE <br /> <br />As with the previous alternative, this alternative was a concept <br />prepared and reviewed during the preparation of the Specific Plan. <br />Unlike the previous alternative, however, this was included in the <br />Specific Plan as the Long Range Concept (Section 4.5 of the <br />Specific Plan). Note that this concept is not the project itself, <br /> <br />26 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.