Laserfiche WebLink
RESOLUTION 94-021 <br />395 <br /> <br />- Monitoring Agency: <br /> <br />Case Planner, City <br />Planning and Building <br />Agency and Engineering <br />Services Manager, City <br />Public Works Agency <br /> <br />SOILS ~%ND GEOLOGY <br /> <br />Prior to any site preparation, the applicant shall obtain a <br />grading permit from the Building Agency and the Public Works <br />Agency in accordance with applicable ordinances of the City. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Grading Permits <br /> <br />- Method of Monitoring: <br /> <br />Grading Plan Check and <br />Review <br /> <br />- Monitoring Agency: <br /> <br />Environmental Coordinator <br />and Supervisor of <br />Inspections, City <br />Building Agency <br /> <br />In order to ensure maximum structural safety in the event of <br />an earthquake, all structures shall be constructed in <br />accordance with the seismic requirements of the Uniform <br />Building Code, subject to the review of the Building Agency. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Building Permits <br /> <br />- Method of Monitoring: <br /> <br />Plan Check and <br />Review/Site Inspection <br /> <br />- Monitoring Agency: <br /> <br />Senior Plan Check <br />Engineer and Inspection <br />Services Manager, City <br />Building Agency <br /> <br />The Planning and Building Agency shall require the preparation <br />of geotechnical studies within those identified areas that are <br />susceptible to subsidence and liquefaction. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Grading Permits <br /> <br /> <br />