Laserfiche WebLink
400 R .SOLUT ON 94-021 <br /> <br />11. <br /> <br />12. <br /> <br />In conformance with current City policy, <br />flood zones shall be required to be at <br />the level of the 100-year flood. <br /> <br />buildings within the <br />least one foot above <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Building Permits <br /> <br />- Method of Monitoring: <br /> <br />Plan Check and Review <br /> <br />- Monitoring Agency: <br /> <br />Inspection Services <br />Manager, City Planning <br />and Building Agency <br /> <br />Prior to issuance of grading permits, if surface water is <br />collected anywhere for discharge as a point source or if a <br />point source discharge is contemplated, the applicant shall <br />obtain a National Pollution Discharge Elimination System <br />Permit (NPDES) from the Regional Water Quality Board. <br /> <br />- Responsible for Implementation: Future Applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to Issuance of <br />Grading Permits <br /> <br />- Method of Monitoring: <br /> <br />Grading Plan Check and <br />Review and Site <br />Inspection <br /> <br />- Monitoring Agency: <br /> <br />Engineering Services <br />Manager, City Public <br />Works Agency and Regional <br />Water Quality Control <br />Board, Orange County <br />Flood Control District <br /> <br />TRAFFIC AND CIRCULATION <br /> <br />13. <br /> <br />Throughout implementation of the Specific Plan, the City's <br />Public Works Agency shall continue to provide those City-wide <br />circulation improvements that are proposed in the Specific <br />Plan, General Plan, and other city circulation improvement <br />plans. <br /> <br />- Responsible for Implementation= City Public Works Agency <br /> <br />- Monitoring Phase: <br /> <br />Throughout Specific Plan <br />Implementation <br /> <br />- Method of Monitoring: <br /> <br />Site Inspection <br /> <br />7 <br /> <br /> <br />