Laserfiche WebLink
RESOLUTION 94-023 <br /> <br />483 <br /> <br />21. <br /> <br />Fifteen (15) parking spaces, or 20 percent of the spaces requested for this minor exception, <br />shall be designated as "30 Minute Parking". These designated spaces shall be located <br />throughout the parking areas direcdy adjacent m decorative paved hardscaped sidewaLks <br />fronting Buildings G, H and J. Additionally the parking should be located those areas that <br />would not require pedestrians to cross any vehicular drive aisles in order to access Buildings <br />D-H and I. Curbs for these spaces shall be painted green. All signage shall be posted and <br />included in the Center's proposed Planned Sign Program. <br /> <br />Timin~ of ImDlementationPqerification <br /> <br />Prior to Ce~ficate of Occupancy <br />issuance <br /> <br />Striping, grading and building plan <br />check: Field inspection <br /> <br />Responsible Parties <br /> <br />Environmental Coord!nator, Case <br />Planner. Planning Division; <br />Engineering Services Manager, <br />Development Engineering Division <br /> <br />22. <br /> <br />The project sponsor shall stage demolition of the existing parking lot and construction of the <br />new parking lot to minimize impacts to patrons of the existing bank and restaurant. A <br />staging plan shall be submitted to the Planning Division and Public Works Agency and <br />approved prior to issuance of grading permits. <br /> <br />Timine of Implementation/Verification <br /> <br />Prior to grading permit issuance <br /> <br />Grading and building plan check <br /> <br />Responsible Parties <br /> <br />Case Planner, Planning Division; <br />Engineering Services Manager, <br />Development Engineering Division <br /> <br />23. The project sponsor shall monitor delivery truck arrival/departure to ensure that no staging <br /> occurs on 16th Street or Williams Street. <br /> <br />Timin~ of Implementation/Veil fication <br /> <br />Condition of Occupancy permit <br />issuance <br /> <br />Method of Verification <br /> <br />Verification from project sponsor, <br />field inspection <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Case <br />Planner, Planning Division; <br />Inspection Services Manager, <br />Building Division <br /> <br />-10- <br /> <br /> <br />