504 RESOLUTION 94-023 <br /> <br />observing earthwork procedures and testing the fills for conformance with He <br />recommendations for earthwork and grading set forth in the geoteclmical report. <br /> <br />Timinff of lmolementation/Vefification <br /> <br />Prior to grading permit <br />issuance: during grading <br /> <br />Grading plan check and/or field <br />inspection <br /> <br />~es~onsible Parties <br /> <br />Senior Plan Check Engineer, <br />Building Division; Engineering <br />Services Manager, Development <br />Engineering Division; <br />Environmental Coordinator, <br />Planning Division <br /> <br />84. A haul route shall be prepared and approved by the Environmental Coordinator and the <br /> Public Works Agency for exported soil material. Haul roues shall be established, where <br /> possible, through non-residential areas so as to minimize the effects of noise and dust. <br /> <br />Timing of Implementation/Vefificafi on <br /> <br />Condition of grading permit; on-going <br />during grading <br /> <br />Method of Verification <br /> <br />Grading plan check <br /> <br />Resoonsible Parties <br /> <br />Environmental Coordinator, Planning <br />Division; Engineering Services <br />Manager, Development Engineering <br />Division <br /> <br />85. <br /> <br />Soil or other materials that may be spilled on the roadways from construction operations <br />shall be removed by the project sponsor by the end of each working day, per SCAQMD <br />Rule 403. Also see mitigation measures for air quality impacts. <br /> <br />Timing of Implementation/Verification <br /> <br />On-going during grading and <br />construction <br /> <br />Method of Verification <br /> <br />Field inspection during <br />grading/construction <br /> <br />Responsible Parties <br /> <br />Engineering Services Manager. <br />Development Engineering Division; <br />Environmental Coordinator, <br />Planning Division; Project Sponsor or <br />representative <br /> <br /> <br />