Laserfiche WebLink
RESOLUTION 94-023 505 <br /> <br />86. <br /> <br />Project structures shall be designed and built in conformance with the Seismic Safety <br />Element of the City's General Plan, applicable portions of the Building and Municipal <br />Codes and requirements of the Public Works Agency. <br /> <br />Timin~ of lmolementation/Verifieation <br /> <br />Prior to approval of any <br />building permits; during <br />construction phase <br /> <br />Building plan check; field <br />inspection <br /> <br />Responsible Parties <br /> <br />Senior Plan Check Engineer, <br />Inspection Services Manager, <br />Building Division <br /> <br />87. New gas lines shall be equipped with automatic shut off valves that would be activated in <br /> the event of an major earthquake. <br /> <br />Timing of Implementation/Verification <br /> <br />Plan check; inspection during <br />construction <br /> <br />Method of Verification <br /> <br />Review of plans; field <br />inspections <br /> <br />Re _sponsible Parties' <br /> <br />Senior Plan Check Engineer, <br />Building Division <br /> <br />88. <br /> <br />All potentially dangerous non-structural features of the project shall be tied into structural <br />elements of the building. Heavy equipment and other potentially hazardous objects shall be <br />secured to floors and walls. <br /> <br />Timine of Imr~lementation/Verification <br /> <br />Plan check; prior to issuance of <br />Certificates of Occupancy for heavy <br />equipment and on-going for non- <br />structural features <br /> <br />Method of Verification <br /> <br />Plan check; on-going inspections <br /> <br />Res_m3nsible Parties <br /> <br />Senior Plan Check Engineer, <br />Building Division; Fire <br />Marshall, Fire Deparanent <br /> <br />89. To assist in response to a seismic event, an emergency response and building specific <br /> evacuation plan shall be developed for the project and posted in each building. <br /> <br />-32- <br /> <br /> <br />