My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Timing of Implementation/Verification <br /> <br />Method of V~gification <br /> <br />Prior to issuance of Certificates of <br />Occupancy; on-going during project <br />operation <br />Field inspection of <br />buildings/verification of tenant's plans <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Planning <br />Division; Supervisor of Inspections, <br />Building Division; Fire <br />Marshal. Fire Department <br /> <br />Hydrolo~, - Drainage and Water Oualitv <br /> <br />90. Prior to the issuance of Certificate of Occupancy of Smith's Superstore, until construction <br /> on those pads commences. To minimize dust generation, any of building pads A, B, D - H. <br /> J or L not under construction, in Building Department Plan Check or it can be shown to the <br /> satisfaction of the City that Plan Check is imminent, then said building pad areas shall be <br /> provided with interim landscaping, as follows: Building D-H, wildflower mix; Buildings A, <br /> B, J, L, planted with tuff grass. <br /> <br />Timin~ of Implementation/Verification <br /> <br />Condition of grading permit issuance <br />(note on grading plan); on-going <br />during construction <br /> <br />Method of Verification <br /> <br />Architectural, landscaping, and <br />grading plan check; periodic field <br />inspection during grading <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, <br />Landscape Associate, Case <br />Planner. Planning Division; <br />inspection Services Supervisor, <br />Building Division <br /> <br />91. Prior to the commencement of construction activities, the project sponsor shall submit a <br /> schedule for timely removal and proper disposal of landscape debris, construction debris, <br /> fuel and chemical residue or other type of potentially harmful residue from areas susceptible <br /> to mnoff. <br /> <br />Timing of Implementation/Verification <br /> <br />Condition of grading pen'nit (note on <br />grading plan) <br /> <br />Field inspections <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, Planning <br />Division: Inspection Services <br />Manager, Building Division; <br />Engineering Services Manager, Public <br />Works Agency <br /> <br />-33- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.