My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Hoistway access switch <br />8. Standby power operation <br />9. Applied car operating panel (vandal resistance) <br /> 10. Telephone <br /> 11. Car position indicator <br /> 12. Audible signal <br /> 13. Emergency car lighting <br /> 14. Hall button <br /> 15. Hall lantern <br /> 16. Hoistway operating devices <br /> 17. Car guides <br /> 18. Centrifugal speed governor <br /> 19. New flooring on the platform <br />20. Door operator close loop <br />21. New interlocks <br />22. Door protection devices <br />23. Car enclosure <br />24. Car door hanger <br />25. Hoistway door hanger <br />26. Pit switch <br />27. Wiring shall comply with all governing codes <br />28. Provide a complete and operable system. <br /> <br />Ceilings: <br /> <br /> 1. Replace existing ceiling tiles with material to match existing for tiles that are damaged <br />during construction. <br /> <br />Heating, Ventilating and Air Conditioning Systems (HVAC) Control System <br /> <br /> 1. A comprehensive energy management system (EMS) that will control the major buildings <br />into one source of control. The existing building automation on each building shall be retrofitted into a <br />single control system. This comprehensive measure will make the facility capable of controlling the <br />electric demand by scheduling shut-downs of non-critical air handling unit (AHU's) and in addition, <br />electric charges together with steam and chilled water consumption will be reduced. <br /> <br /> 2. Furnish and install Siemens System 600 Apogee DDC controls to monitor and control the <br />existing equipment. The communications schematic and typical air handler and zone control drawings <br />for the system to be installed can be reviewed in the attached control scope of this document. <br /> <br /> 3. Contractor will utilize provide communications from the remote buildings listed below to <br />the workstation in the Maintenance Superintendent office provided as part of this project. The <br />workstation is complete with graphical interactive software to enhance ease of use. Contractor will <br />provide (1) Apogee Insight workstation for communications to the new DDC controls in the remote <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.