My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Swimming Pool <br /> <br />Provide energy savings measure to the existing swimming pool of the facility. <br />The existing pool heating system consists of a boiler, sand filter system and 10-HP pump. The pool <br />operates during the summer and is maintained at 80 deg F. <br /> <br />1. Replace existing heater with more efficient heater <br />2. Provide a complete and operable system <br /> <br />Section 10. FACILITY AND OPERATIONAL IMPROVEMENTS: Newhope Library <br /> <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br /> <br />Heating, Ventilating and Air Conditioning (HVAC) equipment <br /> <br />The building is served by one constant volume multi-zone (MZ) air handling unit (AHU) with the <br />direct expansion condensing unit in the roof. The heating is thru a gas heated forced air system. The <br />AHU unit has single speed 7 V2 -hp fan motor. <br /> 1. Replace the existing direct expansion condensing unit in the roof. Capacity shall match the <br />existing unit. Provide the required code approved seismic support. <br /> 2. Replace the AHU supply fan motor with new premium efficiency motor. In addition, <br />replace existing belts, pulleys with new cog belt synchronous type belts and sheaves (Goodyear or <br />equal). <br /> 3. Provide Variable Speed Drive (VSD) to the AHU for the conversion of the dual duct <br />constant air volume (MZ-CAV) to dual duct variable air volume system (MZ-VAV). <br /> 4. Replace the existing MZ dampers with new VAV retrofit dampers. <br /> 5. Provide a complete and operable system. <br /> <br />Heating, Ventilating And Air Conditioning Systems (Hvac) Control System <br /> <br />Section 11. FACILITY AND OPERATIONAL IMPROVEMENTS: Southwest Center <br /> <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br /> <br />Heating, Ventilating and Air Conditioning (HVAC) equipment <br /> <br />The existing four 7 V2 -tons and two 5-tons packaged gas electric air conditioning units serving the <br />building shall be maintained. <br /> <br />1. The mechanical time clocks are installed within the unit casing. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.