My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Heating, Ventilating And Air Conditioning Systems (Hvac) Control System <br /> <br />Section 12. FACILITY AND OPERATIONAL IMPROVEMENTS: El Salvador Center <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br />Swimming Pool <br /> <br />Provide energy savings measure to the existing swimming pool of the facility. <br />The existing pool heating system consists of a boiler, sand filter system and 5HP pump. The pool <br />operates during the summer and is maintained at 80 deg F. <br /> <br /> 1. Replace existing heater with more efficient heater. <br /> 2. Provide a complete and operable system. <br /> <br />Section 13. FACILITY AND OPERATIONAL IMPROVEMENTS: Santa Anita Center: <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br />Swimming Pool <br /> <br />Provide energy savings measure to the existing swimming pool of the facility. <br />The existing pool heating system consists ora boiler, sand filter system and 5-HP pump. The pool <br />operates during the summer and is maintained at 80 deg F. <br /> <br /> 1. Replace existing heater with more efficient heater <br /> 2. Provide a complete and operable system <br /> <br />Section 14. FACILITY AND OPERATIONAL IMPROVEMENTS: Memorial Pool: <br />Swimming Pool <br /> <br />Provide energy savings measure to the existing swimming pool of the facility. <br />The existing pool heating system consists of a boiler, sand filter system and 40-HP pump. The pool <br />operates during the summer and is maintained at 76 deg F. <br /> <br /> 1. Replace existing heater with more efficient heater <br /> 2. Provide a complete and operable system <br /> <br />Section 13. FACILITY AND OPERATIONAL IMPROVEMENTS: Selgado Pool <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.