Laserfiche WebLink
Heating, Ventilating And Air Conditioning Systems (Hvac) Control System <br /> <br />Section 12. FACILITY AND OPERATIONAL IMPROVEMENTS: El Salvador Center <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br />Swimming Pool <br /> <br />Provide energy savings measure to the existing swimming pool of the facility. <br />The existing pool heating system consists of a boiler, sand filter system and 5HP pump. The pool <br />operates during the summer and is maintained at 80 deg F. <br /> <br /> 1. Replace existing heater with more efficient heater. <br /> 2. Provide a complete and operable system. <br /> <br />Section 13. FACILITY AND OPERATIONAL IMPROVEMENTS: Santa Anita Center: <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br />Swimming Pool <br /> <br />Provide energy savings measure to the existing swimming pool of the facility. <br />The existing pool heating system consists ora boiler, sand filter system and 5-HP pump. The pool <br />operates during the summer and is maintained at 80 deg F. <br /> <br /> 1. Replace existing heater with more efficient heater <br /> 2. Provide a complete and operable system <br /> <br />Section 14. FACILITY AND OPERATIONAL IMPROVEMENTS: Memorial Pool: <br />Swimming Pool <br /> <br />Provide energy savings measure to the existing swimming pool of the facility. <br />The existing pool heating system consists of a boiler, sand filter system and 40-HP pump. The pool <br />operates during the summer and is maintained at 76 deg F. <br /> <br /> 1. Replace existing heater with more efficient heater <br /> 2. Provide a complete and operable system <br /> <br />Section 13. FACILITY AND OPERATIONAL IMPROVEMENTS: Selgado Pool <br /> <br /> <br />