Laserfiche WebLink
The contractor shall possess a valid general contractor license and all subcontractors <br />shall be licensed in the respective trade as required by the State of California and the <br />City of Santa Ana. <br /> <br />Obtain the necessary Building/Constructor permits form the City of Santa Ana. <br /> <br />All projects listed in Exhibit A shall be inspected by the City representative for final <br />acceptance, to function and quality of work. <br /> <br />All re-lamping provided by contractor shall meet at a minimum the existing lighting <br />levels. Contractor shall take foot-candles readings prior to and after conversion with a <br />calibrated Meter. (Sylvania Light Meter Model # DS-2000 or equal). <br /> <br />Lamps shall be GE Starcoat T8 Watt-Miser (F38T8 XL) lamps having medium bi-pin <br />bases with a minimum life of 20,000 hours (XL) at 3 hours per start on T8 instant <br />start ballasts, color temperature 4100K, with a color rendering index of at least 81, as <br />specified in Attachment F to Attachment 1 to Exhibit A. <br /> <br />Ballasts shall be GE ULTRA-MAX L with a ballast factor of .77. as specified in <br />Attachment G to Attachment 1 to Exhibit A. <br /> <br />All 8 ft lamps shall be converted to 4 feet GE Starcoat 4 ft Watt Miser (F38t8XL) <br />lamps as described above. <br /> <br />The contractor shall provide a 24 hours fire watch while fire systems are impaired in <br />any of the building where contractor is performing work. <br /> <br />Contractor shall use the Lock-Out Tagout procedure during any and all Electrical <br />work, and in relation to any and all sources of energy. <br /> <br />Contractor shall present a Certified Air Balance Report for all HVAC work in <br />accordance with applicable standards as specified in Attachment D to Attachment 1 to <br />Exhibit A. <br /> <br />All materials used in these projects shall be free of Asbestos, lead, PCB or any related <br />substances. <br /> <br />The contractor is responsible for the engineering of all systems and related <br />components. <br /> <br />The contractor shall have sole responsibility for accuracy of all measurements, <br />estimates of materials quantities, sizes and site conditions that will affect the Scope of <br />Work. <br /> <br /> <br />