My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BENTLEY SYSTEMS INC. - 2003
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
B (INACTIVE)
>
BENTLEY SYSTEMS INC. - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 10:52:01 AM
Creation date
2/17/2004 2:34:20 PM
Metadata
Fields
Template:
Contracts
Company Name
Bentley Systems Incorporated
Contract #
A-2003-218
Agency
Public Works
Council Approval Date
10/6/2003
Expiration Date
11/30/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA MULTIPLE AWARD SCHEDULE (CMAS) <br />INFORMATION TECHNOLOGY <br />' MAINTENANCE SPECIAL <br />PROVISIONS <br />AGENCIES SHOULD DEVELOP AND INCLUDE A STATEMENT OF <br />4, Maintenance Coverage <br />WORK (SOW) WITH THE PURCHASE ORDER. <br />a) Period of maintenance coverage: <br />t. Maintenance of Equipment <br />1) The State may select a period or periods of <br />The contractor is responsible under this contract to maintain the <br />maintenance coverage, as provided for in the contract <br />equipment identified in the purchase order or Statement of Work. <br />and stated in the Statement of Work, in accordance <br />The contractor shall keep the equipment in good operating <br />with the following: <br />condition and shall always be responsive to the maintenance <br />A minimum monthly maintenance charge entitles <br />requirements of the State. Equipment maintenance shall be <br />the State to maintenance coverage during the <br />provided in accordance with this contract, with the period of <br />Principal Period of Maintenance. <br />maintenance coverage, locations, etc. listed in the purchase order <br />The State may select in lieu of the hours available <br />or Statement of Work. <br />for the minimum monthly maintenance charge, <br />one or more of the optional periods of <br />2. Responsibilities of the Contractor <br />maintenance coverage for an additional charge as <br />shown in the contract. <br />a) This maintenance service includes the following and may be <br />ii) The hours of maintenance coverage for a machine on <br />further described in the purchase order or Statement of <br />Monday through Friday shall be the same each day and <br />Work: <br />the hours on Saturday and Sunday shall be the same <br />i) Scheduled preventive maintenance based upon the <br />hours on all Saturdays or Sundays. All machines <br />specific needs of the individual machines as <br />covered under this contract must have a simultaneous <br />determined by manufacturer, <br />span of time within the selected periods of maintenance <br />ii) Unscheduled, on -call remedial maintenance. Such <br />coverage, at least equal to the shortest period offered <br />maintenance will include lubrication, adjustments, and <br />for any machine in the system. <br />replacement of maintenance parts deemed necessary <br />iii) The State may change its selected period of <br />by the contractor. <br />maintenance coverage by giving contractor fifteen (15) <br />b) Maintenance parts will be furnished by contractor and will be <br />days prior written notice. <br />new or equivalent to new in performance when used in these <br />machines. Replaced maintenance parts become the <br />b) Preventive Maintenance (scheduled) <br />property of the contractor. <br />Preventive maintenance can either be performed within or <br />c) Preventive maintenance shall be performed on a schedule <br />outside of the Princioal Period of Maintenance (PPM). An <br />which is mutually acceptable to the State and the contractor, <br />additional charge may be made for preventive maintenance <br />which is consistent with the State's operating requirements, <br />to be performed outside of the PPM, as set forth in the <br />and which is based upon the specific needs of the <br />contract. No additional charge shall be made for preventive <br />equipment as determined by the manufacturer. Such <br />maintenance that is to be perfoned within the PPM. <br />schedules shall be in writing and shall specify the frequency <br />and duration of preventive maintenance for the equipment in <br />c) Remedial Maintenance (unscheduled) <br />the purchase order or Statement of Work. <br />d) Remedial maintenance shall be commenced promptly after <br />i) Remedial maintenance shall be performed after <br />notification by an authorized State representative that <br />notification by authorized State personnel that the <br />equipment and /or software are inoperative. <br />equipment is malfunctioning. <br />ii) The contractor snail provide the State with a designated <br />3. Responsibilities of the State <br />point of contact and will initiate the remedial <br />maintenance. <br />a) The State shall provide an appropriate operating <br />in) There shall be no additional maintenance charges for: <br />environment, including temperature, humidity, and electrical <br />power, in accordance with the environmental requirements <br />Remedial maintenance during the period of <br />contained in the contractor's published specifications for the <br />maintenance coverage unless the remedial <br />equipment listed on the purchase order or Statement of <br />maintenance is due to the fault or negligence of <br />Work. <br />the State. <br />b) Unless mutually agreed to by the contractor and the State, <br />State personnel will not perform maintenance or attempt <br />Time spent by maintenance personnel after arrival <br />repairs to the equipment while such equipment is governed <br />at the site awaiting the arrival of additional <br />by the terms of this contract. <br />maintenance personnel and /or delivery of parts, <br />C) Subject to the State's security regulations, the contractor <br />etc., after a service tail has been commenced. <br />shall have full anc free access to the machines to provide <br />service thereon. <br />• Remedial maintenance required because the <br />scheduled preventive maintenance preceding the <br />malfunction had not been performed, unless the <br />- State had failed to provide access to the <br />equipment. <br />• For time of delay beyond the PPM, contractor <br />shall continue to perform maintenance for the <br />same amount of time outside the covered period <br />without additional charge to the State. <br />February 2001 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.