My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 09 - Bristol-Tolliver Street Urban Green Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/18/2025
>
Item 09 - Bristol-Tolliver Street Urban Green Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 5:39:07 PM
Creation date
3/13/2025 8:05:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
9
Date
3/18/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6600 <br />BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />47 <br />2" Cold Mill and Overlay <br />$ 9 <br />$ 31,230 <br />3,470 <br />SF <br />48 <br />Install Detectable Warning Surface at <br />$ <br />$ 9,000 <br />Alley <br />60 <br />SF <br />150 <br />49 <br />Construct 8" Thick PCC Alley, <br />$ <br />$ <br />Driveway, Curb, and Gutter Pavement <br />2,450 <br />SF <br />45 <br />110,250 <br />per C.S.A Plan No. 1111 <br />50 <br />Construct 8" Thick PCC Longitudinal <br />$ <br />$ <br />Gutter <br />40 <br />SF <br />200 <br />8,000 <br />51 <br />Construct 4" Thick PCC Sidewalk with <br />$ <br />$ <br />Integral Color <br />8,460 <br />SF <br />24 <br />203,040 <br />52 <br />Construct 8" Thick PCC Vehicular Rated <br />$ <br />$ <br />Sidewalk with Integral Color, Curb, and <br />490 <br />SF <br />45 <br />22,050 <br />Curb Opening <br />53 <br />Construct PCC Curb Ramp Incl. Curb, <br />$ <br />$ <br />Gutter, and Detectable Warning Surface <br />260 <br />SF <br />140 <br />36,400 <br />54 <br />Install Continental Crosswalk Striping. <br />$ <br />$ <br />Remove and Reinstall Stop Bar, Stop <br />I <br />LS <br />20,000 <br />20,000 <br />Marking, and Turn Arrow. <br />55 <br />Construct Crushed Miscellaneous Base <br />$ 120 <br />$ <br />163 <br />CY <br />19,560 <br />56 <br />Construct 6" Wide Concrete Header <br />$ <br />75 <br />$ <br />480 <br />LF <br />36,000 <br />57 <br />Construct Poured -In -Place Rubber <br />$ <br />$ <br />Surfacing Incl. Base Courses <br />3,640 <br />SF <br />27.50 <br />100,100 <br />58 <br />Construct Interlocking Concrete Pavers <br />$ <br />40 <br />$ <br />67,200 <br />Incl. Base Courses <br />1,680 <br />SF <br />59 <br />Install Interpretive Signage <br />$ <br />$ <br />3 <br />EA <br />4,000 <br />12,000 <br />60 <br />Install Entry Signage <br />2 <br />EA <br />$ 12,500 <br />$ 25,000 <br />61 <br />Install General Park Signage <br />$ 10,000 <br />$ 10,000 <br />1 <br />LS <br />62 <br />Construction Permit <br />$19,410 <br />$19,410 <br />1 <br />LS <br />63 <br />SWPPP Preparation (Risk Level 2) and <br />$ 30,000 <br />$ 30,000 <br />Implementation <br />I <br />LS <br />64 <br />Urban Greening Program Funding <br />$ 10,000 <br />$ 10,000 <br />Acknowledgement Sign <br />1 <br />EA <br />65 <br />Construct Removeable Bollard <br />3 <br />EA <br />$ 3,000 <br />$ 9,000 <br />66 <br />Install Bench <br />10 <br />EA <br />$ 3,000 <br />$ 30,000 <br />P-4 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.