Laserfiche WebLink
<br />3. <br /> <br />Property Damage Liability <br /> <br />3.1 <br /> <br />Contractor will be solely responsible for damage to property, which may <br />be caused by acts or omissions by him or anyone in his employ while <br />executing the contract and shall maintain $2,000,000 per occurrence. <br /> <br />PART 6 - SURVEY <br /> <br />1. <br /> <br />Site Survey <br /> <br />1.1 <br /> <br />. The Company shall perform a site survey to inspect the complete scope of <br />this project. <br /> <br />PART 7 - NOTICE TO BIDDER <br /> <br />, , <br /> <br />1. <br /> <br />Failure to complete the required information with the bid will result in the bid not <br />being accepted. <br /> <br />/ / <br /> <br />2. <br /> <br />Failure to meet any or all of the requirements outlined in this specification will <br />result in the bid not being accepted. <br /> <br />3. <br /> <br />Facility reserves the right to reject any and all bids. <br /> <br />PART 8 - DETAilS OF FIRE ALARM INSPECTIONS <br /> <br />1. <br /> <br />Fire Control Panel <br /> <br />. All zones operate alarm <br />. All zones operate trouble <br />. Common trouble indicators operate <br />. All fuses agree with markings <br />. Battery standby operational <br />. AC power feeds correct <br /> <br />2. <br /> <br />Annunciator Panels <br /> <br />. All indicators operate <br />. All auxiliary functions operate <br />. labeling is correct and definitive <br /> <br />3. <br /> <br />Peripheral Devices <br /> <br />. All indicating devices tested for alarm, including sprinkler switches <br />. All indicating devices tested for trouble, including sprinkler switches <br />. All signaling devices tested for operation <br />. All signaling devices tested for trouble <br />. Audibility test <br /> <br />Word\Spec - Fire Alann System <br /> <br />6 <br /> <br />9/14/04 <br /> <br />¡ <br />