My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
02/22/2005
>
FULL PACKET_2005-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 10:25:28 AM
Creation date
2/16/2005 1:43:47 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Place <br />Focused Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />Findings Related to Impacts at Lawson Way Segment <br /> <br />Changes, or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the EIR. <br /> <br />Facts in Support ofthe Finding Related to Lawson Way Segment <br /> <br />As discussed in Section 4.9 of the EIR, in 2025, the segment of Lawson Way between Memory <br />Lane and Town Country road will be significantly impacted by project related traffic, The <br />implementation of mitigation measure T-3 and T-4 below will improve the level of service to <br />acceptable LOS A for 2025 traffic conditions, <br /> <br />T -3 Prior to issuance of certificate of occupancy permits the applicant shall coordinate with <br />the City of Orange for the removal of on street parking along Lawson Way between <br />Memory Lane and Town and Country Road, This will require approval from the City of <br />Orange Traffic Commission <br /> <br />T -4 Prior to the issuance of certificate of occupancy permits, and subject to the City of <br />orange's approval, the applicant shall restripe Lawson Way to provide two lanes in <br />direction between Memory Lane and Town Country Road, <br /> <br />Level of Significance of Impacts Related to Impacts at the Lawson Way Segment <br /> <br />The adverse impacts of the City Place project related to impacts at the Lawson Way segment will <br />be mitigated to below a level of significance based on implementation of mitigation measures T- <br />3 and T-4. <br /> <br />Findings Related to Impacts at Intersection of Memory Lane and Lawson Way <br /> <br />Changes, or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the EIR. <br /> <br />Facts in Support of the Finding Related to Impacts at Intersection of Memory Lane and Lawson <br />Way <br /> <br />As discussed in Section 4,9 of the EIR, the planning warrant analysis shows that traffic signal <br />installation is warranted at the intersection of Lawson Way and Memory Lane, The <br />implementation of mitigation measure T -5 below will ensure that intersection will operate at an <br />acceptable level of service, <br /> <br />T -5 Prior to the issuance of certificate of occupancy permits the applicant shall pay full costs <br />for a traffic signal at Memory Lane and Lawson Way, <br /> <br />Level of Significance of Impacts Related to Impacts at the Intersection of Memory Lane and <br />Lawson Way <br /> <br />U: \DBott\wp51 I City Place jindings, doc <br />September 29, 2004 <br /> <br />Page 16 <br /> <br />75A-138 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.