My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />Deliverables: The end product of this work element will be: <br /> <br />. <br /> <br />The definition and specification ofthe fare collection system to the 30% design leve\. <br /> <br />The following paragraphs describes in greater detail the work scope that resulted from the <br />CONSULTANT's input during negotiations of the PE consulting services contract. <br /> <br />The following clarificatons are included as part of the CONSULTANT's Schedule of Values: <br /> <br />Task 13.01 Fare Collection System Criteria <br />. Design Criteria for PE 13. scope of work. ' <br />. Operational and Design requirements from the alternatives described in studies in Schedule <br />of Values Tasks 13.02 and 13.03 are finalized by end of 6th month. <br /> <br />Task 13.02 Study and Report on Other Southern California Systems and Existing Bus System <br />. Study of existing systems based on 7 light rail systems (5 California wide and 2 other) and 6 <br />Southern California bus systems (including AUTHORITY). <br /> <br />Task 13.03 Evaluate Smart Card and On-Board Checking <br />. As defmed in PE 13. <br /> <br />Task 13.04 Fare Collection System PE <br />. Effort for calculation of equipment quantities based on latest patronage values available at <br />end of 12th month of the PE design. <br />. Technical characteristics of existing AUTHORITY bus system equipment available from <br />AUTHORITY when/ifrequiæd, <br /> <br />PE 14. <br /> <br />Preliminary Specification of the Rail Passenger Vehicle <br /> <br />The Conceptual Engineering phase of the program established the key parameters for the <br />passenger rail vehicle, specifically that it be low floor, double-articulated, approximately 90-foot <br />long, with otherwise standard light rail vehicle features, including an operating speed of 55 miles <br />per hour or better. Initial operating plans determined that 24 vehicles will be needed initially. ' <br /> <br />The CONSULTANT will take this basic understanding of the vehicle and advance its definition <br />and specifications to the 30% design level utilizing trade-off studies, aI1d life-cycle cost analyses <br />where applicable, Equally important will be the CONSULTANT's assessment of the direction of <br />the latcst industry standards and designs so that the CenterLine program can take advantage of <br />joint procurements, common specifications of subsystems, and competitive solicitation, The <br />CONSULTANT will work closely with The AUTHORITY staff in order to seek and obtain <br />timely decisions on direction, The CONSULTANT will begin addressing the following areas <br />immediate1y after the NTP for coordination with the Public Involvement Program and the three <br />cities teclmical staff <br /> <br />49 <br /> <br />,...-- <br />....--- <br /> <br /> <br />6[ <br />
The URL can be used to link to this page
Your browser does not support the video tag.