My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />-- <br />,...-"-..- <br /> <br />Deliverables: The CONSULTANT will prepare the following as part of this work task: <br /> <br />. <br /> <br />A final, 30% design level cost estimate for the CenterLine project and all its~project <br />elements. <br /> <br />The following paragraphs describes in greater detail the work scope that resulted from the <br />CONSULTANT's input during negotiations of the PE consulting services contract.' " <br /> <br />The following clarifications are included as part of the CONSULTANT's Schedule of Values: <br /> <br />Cost estimates will be prepared for the disciplines shown below (listed by Schedule of Values <br />Task): <br /> <br />Task 15.01 <br />Task 15.02 <br />Task 15,03 <br />Task 15.04 <br />Task 15.05 <br />Task 15.06 <br />Task 15.07 <br />Task 15.08 <br />Task 15.09 <br />Task 15,10 <br />Task 15.11 <br />Task 15,12 <br />Task 15,13 <br /> <br />Roadway Cost Estimates <br />Stmctures Cost Estimates <br />Trackwork Cost Estimates <br />Traffic Cost Estimates <br />CMF Cost Estimates <br />Stations Cost Estimates <br />Traction Electrification System Cost Estimates <br />Communication Cost Estimates <br />Train Control Cost Estimates <br />Fare Collection System Cost Estimates <br />Rail Passenger Vehicle Cost Estimates <br />RlW Acquisition Cost Estimates <br />Utilities Relocation Cost Estimates <br /> <br />, , <br /> <br />Schedule of Values Task 15.14, Project Estimates, is the overall Project Current Working <br />Estimate, <br /> <br />PE 16. <br /> <br />Property Identification and Mapping <br /> <br />The CenterLine project will require the acquisition of property along its length through Santa <br />Ana, Costa Mesa, and Irvine, Because of the long lead times needed to purchase property, it will <br />be important to determine during Preliminary Engineering as accurately as possible, the property <br />required for operating the light rail system, <br /> <br />Based on the Conceptual Engineering work, the CONSULTANT will prepare mapping which <br />shows all expected property takes and keep those maps updated as the design progresses, <br />Infom1ation on parcel boundaries will be transferred as soon as possible to the station base maps <br />so that designers, the FEISIFEIR CONSULTANT, and the public are aware of how the <br />preliminary design may affect property acquisition, The CONSULTANT will tabulate parcel <br />infonnation from the tax assessors maps for all parcels, or portions of parcels, expected to be <br />acquired, <br /> <br />53 <br /> <br />~' <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.