My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 2-0149 <br />Exhibit A <br /> <br />The AUTHORITY is looking for comprehensive and creative approaches to <br />completing the necessary environmental analysis for The Centerline Project. <br />The DEIS/DEIR (September 1999) and the SDEIS/RDEIR (December 2000) <br />have not yet been certified by the lead agencies (The AUTHORITY for the ËIR <br />and FTA for the EIS). However, a considerable amount of environmental analysis <br />has been completed on the LPA. Therefore, it will be imperative for the <br />CONSULTANT to review the existing environmental documentation to identify <br />what has been completed to date, and to coordinate with the Preliminary <br />Engineering consultant to determine what changes or refinements are being <br />made. The Preliminary Engineering consultant will have management and <br />coordination oversight of the FEIS CONSULTANT. The Preliminary Engineering <br />RFP included the following directions: "... the (PE) work does not involve <br />performing the preparation, processing, and clearance of FEIS/FEIR; this work is <br />to be addressed in a separate procurement. However, the PE consultant shall <br />be responsible for coordinating and providing project management oversight of <br />the FEIS/FEIR effort." <br /> <br />The FEIS CONSULTANT will identify the level of environmental analysis required <br />to comply with both CEQA and NEPA. Once the determination has been made <br />as to the level of analysis required, the CONSULTANT will be required to <br />complete this analysis, preparing a New SDEIS/RDEIR, and a draft and final <br />environmental (FEIS/EIR) document, as well as providing copying and <br />dissemination of the reports. <br /> <br />The primary tasks identified in later paragraphs are required to complete the <br />environmental work for this project. The CONSULTANT is encouraged to <br />develop or recommend any additional tasks that would assist The AUTHORITY <br />in preparing this work. <br /> <br />The following clarification is included as part of the CONSULTANT's Work <br />Breakdown Structure (WBS): Task 0 has been added for Project Management. <br /> <br />Task 0 - Project Management <br /> <br />This task includes the management necessary to ensure the timely and efficient <br />progression of the PROJECT environmental process. It includes providing <br />advice to The AUTHORITY as needed and the management of the <br />CONSULTANT staff and subconsultants. We will develop and maintain project <br />management and quality control plans, style guides, responsibilities matrices, <br />contact lists, and similar tools for effective management. The CONSULTANT will <br />provide bi-weekly status reports under this task. <br /> <br />Under this task the CONSULTANT will prepare accurate and easy-to-understand <br />monthly invoices and work closely with The AUTHORITY's Program Manager to <br />ensure that necessary back-up is provided for these invoices, including a monthly <br />progress report. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.