My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NEWPORT BEACH, CITY OF 2 -2004
Clerk
>
Contracts / Agreements
>
N
>
NEWPORT BEACH, CITY OF 2 -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:41:29 PM
Creation date
3/30/2005 9:58:27 AM
Metadata
Fields
Template:
Contracts
Company Name
City of Newport Beach
Contract #
A-2004-176-06
Agency
Police
Council Approval Date
8/16/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attachment B <br /> <br />manager be on site less than 2 days in a calendar month. These requirements <br />are applicable to both Phase 1 and Phase 2. <br /> <br />SOW1-3 System Staff on Site Support <br />For Phase 1, programmers and systems specialists capable of making any <br />required changes to the system shall be on site on a full time basis for the <br />duration of system integration testing, and on a half time basis through to <br />provisional acceptance of Phase 1. Support personnel capable of restoring the <br />system shall be available within 4 hours through Final Acceptance of the system. <br />The same requirements apply to Phase 2 incremental projects. <br /> <br />SOW 2 - Services <br /> <br />SOW2.1 Inception <br />For Phase 1, the Vendor shall meet with the Orange County Integrated Law & <br />Justice project management as often as necessary over the period of 3 weeks to <br />finalize the project plan, schedule initial meetings and workshops and agree and <br />document project processes, procedures and reporting systems. For costing <br />purposes, the Vendor should expect to meet onsite at least 3 days per week. <br /> <br />For Phase 2, the Vendor shall meet with the Orange County Integrated Law & <br />Justice project management as often as necessary, for each RMS system to be <br />integrated, to finalize the project plan, schedule initial meetings and workshops <br />and agree and document project processes, procedures and reporting systems. <br />For costing purposes, the Vendor should expect to meet for 3 days for each site. <br />This meeting period will commence within 3 weeks of the vendor being notified <br />that OCILJ wishes to add an RMS system to the integration solution. <br /> <br />Requirements for the number of days spent onsite for the Inception services are <br />included here for cost purposes. Actual time requirements for Inception services <br />may vary. <br /> <br />SOW2-2 Site Surveys <br />In conjunction with the inception meetings, the Vendor shall visit all sites <br />included in the phase and work with technical personnel at that agency as well <br />as the agency's RMS vendor to fully validate their approach and design for <br />integration with the data at that site. During these visits the Vendor shall <br />determine the installation requirements for the OCILJ Data Sharing Solution <br />components to be installed and the suitability of the facilities and infrastructure of <br />the sites to house the system and associated equipment. The findings of these <br />examinations will be compiled by the Vendor and submitted to the OCILJ <br />Steering Committee. OCILJ police agencies will implement physical plant <br />electrical and network facilities to support the system based on the report <br />provided by the Vendor. <br /> <br />SOW2-3 Requirements Validation Workshops <br />The Vendor shall conduct requirements validation workshops to walk through all <br />of the Orange County Integrated Law & Justice requirements and determine the <br />required configuration details. Workshops will need to be held for each site that <br /> <br />22 <br /> <br />')l/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.