My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NEWPORT BEACH, CITY OF 2 -2004
Clerk
>
Contracts / Agreements
>
N
>
NEWPORT BEACH, CITY OF 2 -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:41:29 PM
Creation date
3/30/2005 9:58:27 AM
Metadata
Fields
Template:
Contracts
Company Name
City of Newport Beach
Contract #
A-2004-176-06
Agency
Police
Council Approval Date
8/16/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Attachment B <br /> <br />The OCILJ police agencies have information technology groups and have been using <br />the services of various consultants to serve the justice community for some time. The <br />following services associated with this project will be undertaken by a combination of <br />separate consultants and the OCILJ police agency information technology personnel <br />and are not the responsibility of the Vendor. <br /> <br />SOW8-1 Change Management Program <br />The Vendor is not responsible for implementing or operating a change <br />management or stakeholder communications program. These activities will be <br />undertaken by OCILJ and its consultants. <br /> <br />SOW8-2 Networking Facilities <br />The OCILJ Working Group will implement all local and wide area network <br />facilities other than those specifically requested in the Scope of Work. The <br />Vendor's responsibilities are limited to specifying the improvements required to <br />network infrastructure during proposal submission and as a result of the design <br />effort and site visits. <br /> <br />SOW8-3 Physical Plant and Electrical Service <br />The OCILJ Working Group will implement all physical plant and electrical <br />services based on the requirements the Vendor presents as a result of the site <br />visits. <br /> <br />SOW 9 - Proposal Revisions <br /> <br />Through the evaluation process a number of items were reviewed and as a result, the <br />following will apply: <br /> <br />SOW9-1 Revised Hardware Solution <br />The CONTRACTOR will provide an alternate hardware solution as outlined <br />below as a replacement for the Unisys Server initially proposed. <br /> <br />Revised Hardware Solution to be delivered by KCC I Unisys <br /> <br />SOW9-2 Enhanced System Audit Functionality <br />The CONTRACTOR will enhance their system audit functionality in conjunction <br />with this project. The new functionality will include a plain language explanation <br />of each transaction (search) conducted as well as a hyperlink that will <br />immediately reproduce that transaction and display the result set to the user. It <br />is understood that the result set will be based on data current in the system at <br />time of execution. <br /> <br />31 <br /> <br />af, <br />
The URL can be used to link to this page
Your browser does not support the video tag.