— Work Plan 2 -76 <br />4,5 Lau dscape/Irrigatiou Plan (As- Needed, Optional): Should the City decide that a <br />landscape /irrigation plan is necessary, our team will evaluate options available and develop cost <br />estimates. <br />4.6 Permitting Requirements: The permits and environmental documentation required by the <br />project will depend to some extent on the alternatives selected during the pre - design phase. M &E <br />staff will assist the City with the preparation of permit applications as required; the level of <br />assistance will be limited to the hours allocated to this effort in the final project budget. No <br />environmental assessment work is included in this work plan. <br />4.7 Pre - Design Report: M &E will prepare a preliminary engineering design report that will <br />discuss the structural, mechanical, electrical/control, and landscaping alternatives considered and <br />the rationale for the selection of the preferred alternatives. The report will include schematic <br />representations of the newly configured pump station components. Data from preliminary <br />contacts with vendors will be appended to the report. Three copies of a draft report will be <br />submitted to the City. Comments, revisions, and suggestions from the City will be incorporated <br />into the report. Ten copies of the final report will be submitted to the City, along with two CDs <br />containing the report in electronic format (Adobe "PDF" files; Word "Doc" files may also be <br />included at City's request). <br />4.8 Preliminary Design Review Meeting: The Draft Prcli•,iinary Er, {neering Design Report will <br />be presented to the City during this meeting. The selected structural, mechanical, <br />electricallcontrols, and landscaping alternatives will be presented and the rationale for their <br />selection discussed. <br />Task 5. Engineering Design <br />Objectives: Prepare construction drawings, specifications, bid items lists, and cost estimates for <br />the pump station improvements identified in the pre - design report and approved by the City. <br />5.160% Submittal: Our consulting team will perform the necessary engineering calculations to <br />size, configure, and locate new or modified system components. The preliminary engineering <br />designs will go through a complete QA/QC process before final drafting is started. <br />Construction/installation drawings for the pump station improvements will be prepared in Micro <br />Station. The drawings will use City - provided title blocks and formats. Specifications will be <br />prepared using City - provided standard specifications as the base (City to provide Word files of <br />standard specifications). Cost estimates will be prepared using standard cost estimating forms <br />that include units, quantities, unit costs, and total costs for each item. For the 60% submittal the <br />City will be provided with: <br />Five sets of full size (24 by 36 inches) drawings to include <br />• Index and site layout <br />o Structural improvements <br />• Mechanical improvements <br />• Electrical improvements <br />• Site Grading/Paving, Landscaping <br />Company Confidential • Trade Secret and Proprietor Information of Metcalf & Eddy, Inc. <br />