My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J & G INDUSTRIES, INC. 1 -2006
Clerk
>
Contracts / Agreements
>
J
>
J & G INDUSTRIES, INC. 1 -2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 12:47:59 PM
Creation date
7/26/2006 9:21:24 AM
Metadata
Fields
Template:
Contracts
Company Name
J & G INDUSTRIES, INC.
Contract #
A-2006-102
Agency
Public Works
Council Approval Date
5/1/2006
Insurance Exp Date
11/1/2011
Notes
worker's comp ins. exp 10-01-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana February 15, 2006 <br />Request for Qualifications - Demolition Services <br />appropriate signing displayed (i.e. no trespassing, keep out demolition in progress, danger, etc.); verify all <br />utilities have been terminated; and erosion control measures are in place, as needed and required. The <br />Field Superintendent will use a checklist to complete the pre-demolition survey. The Field Superintendent <br />will confirm with the Project Manger that the demolition area is ready for demolition. Structures ready for <br />demolished will be clearly marked "CLEAR FOR DEMO J&G." <br />Field Superintendent will direct crews in: structure demolition; improvements demolition; salvaging <br />procedures; solid waste clearing and disposal. Where practical, concrete, asphalt, steel, non-ferrous metals, <br />and wood will be segregated and sent off-site for recycling. If required, the site will be backfilled and graded. <br />Field Superintendent will review fieldwork daily for compliance with CTO specifications and record findings in <br />a quality control log. <br />Field personnel are trained to stop work upon the discovery of suspect asbestos, regulated, or hazardous <br />waste. The Field Superintendent will contact the Project Manager, who in turn will contact CSA. The Field <br />Superintendent shall leave the work site in a clean and neat condition, upon completion of the CTO. The <br />Project Manager will notify those agencies required for final inspections and sign offs. <br />The Project Manager will track the CTO schedule and budget by using project management software. <br />Schedule and budget updates will be provided to the CSA as required. Project Manager will notify CSA to <br />have all work inspected within 24 hours of CTO work completion. The Project Manager will prepare all <br />required paperwork for final closure package and billing for the project. <br />Mart concurrence <br />J&G's Project Manager will first manage the services that are required to be performed within 24 hours of <br />CTO execution. If required, fencing will be installed to secure the site. All necessary notices, ordinances, <br />statues rules, laws, and regulations shall be followed in the performance of the CTO. <br />yuanty control <br />J&G uses quality, schedule and budget control procedures in the office and field management of each CTO. <br />Project schedules and work sub-task costs are prepared to start each CTO. The Project Manager will track <br />the CTO schedule and budget by using project management software. Schedule and budget updates will be <br />provided to the OCTA as required. J&G office staff assists the Project Manager in maintaining a project file <br />(notification records, agency points of contact, etc.) for each CTO. Project Manager will notify CSA to have <br />all work inspected within 24 hours of CTO work completion. The Project Manager will prepare all required <br />paperwork for final closure package and billing for the project. <br />J&G's project files will be available for inspections by the CSA, county, state and federal representatives, <br />and shall be submitted to the CSA when requested. <br />At the start of the CTO, the Field Superintendent will visually survey existing improvements and utilities near <br />the work site, in order to protect them from damage. Field Superintendent will also visually survey the site for <br />potential materials containing regulated/hazardous wastes. The Project Manager will contact CSA of any <br />findings. <br />The Field Superintendent will use a checklist to complete the pre-demolition survey. The Field <br />Superintendent will confirm with the Project Manger that the demolition area is ready for demolition. <br />Structures ready for demolished will be clearly marked "CLEAR FOR DEMO J&G." <br />Field Superintendent will review fieldwork daily for compliance with CTO specifications and record findings in <br />a quality control log. <br />industries Page 9
The URL can be used to link to this page
Your browser does not support the video tag.