My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ABBEY GROUP - 2016
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
A (INACTIVE)
>
ABBEY GROUP - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2015 12:56:18 PM
Creation date
7/26/2006 10:50:18 AM
Metadata
Fields
Template:
Contracts
Company Name
ABBEY GROUP
Contract #
A-2006-141
Agency
POLICE
Council Approval Date
6/19/2006
Expiration Date
12/1/2006
Insurance Exp Date
3/20/2008
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A: Statement of Work <br />Completion Criteria: <br />This task is considered complete when the Project Initiation Session has been held with Abbey Group <br />representatives in attendance, an action item log has been developed by both Abbey Group and Santa <br />Ana, and a schedule has been prepared and all subtasks have been completed in their entirety. <br />Task 1-A: Finalize Hardware Requirements and Conduct Site Survey/Preparation <br />Objective: Validate and finalize Santa Ana's hardware and third-party software requirements. <br />Task Description: <br />Abbey Group will reevaluate the proposed hardware configuration for accuracy and completeness. This <br />validation step will also include verification of hardware, operating system software, and third-party <br />software warranty periods and future maintenance costs (if any). <br />Responsibilities: <br />Abbey Group shall: <br />a. Verify with Santa Ana personnel, Abbey Group recommended computer processor(s), operating <br />system software, third-party software, all associated workstations, printers, communications and <br />related components. <br />b. Assign a hardware technician to review all hardware, operating system software and third-party <br />products. <br />c. Prepare a final hardware and operating system software deliverables list, thus amending Project <br />Deliverables as appropriate. <br />d. Pre-plan installation activities with Santa Ana and any subcontractors. <br />Santa Ana shall: <br />a. Provide, upon request, information on existing hardware and operating system software <br />components and terminal networks, as well as projected utilization statistics and other information <br />as is reasonably required to validate final hardware requirements. <br />b. Review the final hardware and operating system software configuration with the Abbey Group <br />project team. <br />c. Review Abbey Group's recommendations regarding any existing communications networks and <br />workstations and make any and all necessary modifications identified by Abbey Group to ensure <br />compatibility with the equipment and system to be installed. <br />Completion Criteria: <br />This task is considered complete when: <br />The final hardware and operating system software configuration is complete and warranty periods for all <br />equipment, operating system software and third-party software are determined and documented. <br />Task 1-B: Develop Project Schedule <br />Objective: Establish the Project Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.